Laserfiche WebLink
I= <br />Cost of the Work; <br />11.4 The term Cost of the Work means the sum of all costs necessarily incurred and paid by <br />CONTRACTOR in the proper performance of the Work. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of <br />the Project, shall include only the following items and shall not include any of the costs itemized in <br />paragraph 1t.5� <br />11.1.1 For all labor and foremen (CONTRACTORS and subcontractors) in direct charge <br />ofthe authorize operations, die CON'T'RACTOR shall receive die current local rate <br />of wages, to be agreed upon in writing before starting such work, for each hour that <br />said labor and foremen are actually engaged thereon, to which shall be added art <br />amount dual to 15 percent (15%) oftlre sunt thereofwhich shall be considered and <br />accepted as full compensation for general supervision and the furnishing of small <br />tools and miscellaneous oquipment used, such as picks, shovels, hand pumps, and <br />similar items. <br />11.42 For all materials used (by CONTRACTOR or subcontractor), die CONTRACTOR <br />shall receive the actual cost of such materials delivered at the site or previously <br />approved cleliverypoint as established by original receipted bills. No percentage shall <br />be added to this cost. <br />11.43 For special equipment and machinery (used by CONTRACTOR or subcontractor) <br />such as power driven pumps, concrete mixers, tricks, and tractors, or other <br />equipment required for the economical performance of the authorized work, the <br />CONTRACTOR shall receive payment based on the agreed rental price for each item <br />of equipment and the actual tune of its use oar die work. No percentage shall be added <br />to this cost. <br />i 1.4.4 The CONTRACTOR'S profit shall be computed by taking ten (10%) percent of the <br />sum of items 11 A.1 (less the 15% added). 11.4.2, and 11 .4-3 above. <br />11 ,4.5 The total cost of performing this extra work shall then be the scam o€items 1 1.4.1, <br />11.4.2, 11.4.3, and 11.4.4. <br />11.4-6 Records of extra work done, if any, shalt be reviewed at die end of each day by the. <br />CONTRACTOR or his representative and at die discretion of the Engineer, duplicate <br />copies of accepted records made and signed by both CONTRACTOR or his <br />representative and the Engineer, and one copy retained by each.. <br />11.5 The term cost of the Work shall not include any of the tbllowing: <br />11.5.1 Payroll costs and other compensation of CONTRACTOR's officers, executives, <br />principals (of partnership and sole proprietorships), general managers, engineers, <br />architects, estimators, attorneys, auditors, accountants, purchasing and contracting <br />agents, expediters, timekeepers, clerks and adner personnel employed by <br />CONTRAC'T'OR whether at fie site or in CONTRACTOR's principal or a branch <br />office for general administration of die Work and not specifically included in the r , <br />agreed upon schedule of job classifications referred to in paragraph 11.4.1 all of <br />which are to be considered administrative costs covered by the CONTRACTOR's <br />Fee, <br />GENERAL CC]NDETIONS <br />GC - 24 <br />