My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-006
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:29:34 AM
Creation date
2/9/2024 11:28:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/04/2000
Control Number
2000-006
Entity Name
State of Florida Community Affairs (EMS)
Subject
Approval of Hurricane Irene Public Assistance Disaster Relief
Funding Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G <br />that household hazardous waste meeting the definition set forth <br />in 40 CPR shall be handled in a manner which meets all Federal, <br />State and local laws and regulations. Subgrantee further <br />represents and warrants that the: presence of any condition(s) or <br />material(s) on site, which is subject to Federal, State or local <br />laws and regulations (including but not. limited to: above ground <br />or underground storage tanks or vessels, asbestos, pollutants, <br />irritants, pesticides, contaminants, petroleum products, waste, <br />chemicals, and septic tanks), shall be handled and disposed of in <br />accordance with the pertinent requirements. <br />20. REPORTS: The Subgrantee shall provide quarterly progress <br />reports to the Grantee, using the ateacued Quarterly Report Form, <br />Attachment F. Refer to the "Quarte=rly Report Schedule and <br />Instructions" (Attachment r) for the due date of the first <br />report. Reports are due quarterly thereafter until. the work has <br />been completed and approved through final inspection. Reports <br />shall indicate the status and completion date for each project <br />funded, any problems or circumstances affecting completion dates, <br />or the scope of work, or the project costs, and any other factors <br />reasonably anticipated to result in noncompliance with the terms <br />of t.h:: grant aw yd. 111L a lire iiasptuctiorw —iliall be -ch4duled by <br />the Subgrantee prior to the final inspection and may be required <br />by the Grantee based on information supplied in the quarterly <br />reports. The Grantee may require additional reports as needed. <br />The Subgrantee shall, as soon as possible, provide any additional <br />reports requested by the Grantee. The Grantee contact will be <br />Page 16 FFMAAYW( DR -F1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.