Laserfiche WebLink
5. Funds from this Agreement may not be expended on salaries, training. or parts replacement or repairs to <br />rented or contractor owned (equipment. <br />DEPLOYMENT LOCATION OF REEF UNITS <br />similar fila and <br />6. Reef Materials will be placed in approximateiv four equal sued 500 ton piles of print <br />vertical relief in the following four designated comers of three one mile square permn site", ft 2. 03, and 04 <br />Ah4,rlh Lummnh• Wc%/ 1.ungtmigh, h, f,th th%la rr,nd liwnr,i; <br />born S, h,nrnn, lnlrl <br />Reef Site b2 27° 55.441' go" I5 441 W, feet 1-1) 7 . 7 ' nn, <br />(NW Corner) <br />Reef Site b3 27' 54.733' K0, 13 71st 71 feat xx . I i 7 run <br />(NW Cotner) <br />Reef Site M4 27' 55.537• 90' 12 733' 71 feet xi I I fedi <br />(NW Corner) <br />Reef Site #4 27" 54.674' xtr' I 1 x6i 7, f,:,t xn'. I Inn, <br />(S[ ('omer) <br />REEF DEPLOYMENT OVERSIGHT The County -s ('ontract Manager ghail o,cr•.ac the tc,ol+,ran <br />i <br />marking of each patch reef deployment location in ad%ancc of rcif unit &PI -went m order t„ .,sods( the <br />ym <br />subcontractor in thepe ro r P lacc�rricrut of reef units The markers %hall tx colored buoNs ruo less than 12 <br />P <br />inches in diameter and sufficiently anchored so that thcro will not drift off ttuc &-mgrrated dcpl,nurant %rtes <br />prior to deployment The Department will not pay for materials Placed ortrtsuda the txrinrt arias as <br />described at the time of'deployment, lkcausc dcplo)ment centers are within 4W feet of the cormrs, secure <br />material delivery vessel anchoring is critical Precis; DGPS placement of markcr buo%s that oh, not %hil'l <br />position with time will also be important to insure the reefs rcmam wrthuo the parmrttcd areas <br />7. The County's Project Manager or County employee dcsignatf-A xs an oftic,al oh,ancr shrill remain on <br />site duthe entire deployment phase of the operation and confirm the Ditfcranuai 6PS coordusUcs of the <br />nf� <br />individual placements as well as the maximum vertical relief of the constructed reefs <br />Is: l have on site current nautical charts of the deplo}ment area. <br />Hath{hc County and its subcontractor shal <br />!!with the7permittcd site indicated on the chart. and the proposcxd patch reef coondtrtatcs The Counth <br />`;obsery&shall also be in possession of a copy of the permit for the areas where the dcplo%incots are taking <br />place.:... <br />y. ThE County agrees to allow the Department to conduct on-site inspections of the saltwater artificial <br />f1Shin j-ieef project before, during, and after the deployment. <br />LIAIIILi`t'Y AND RESPONSWILI I'V FOR REEF MA'T'ERIALS <br />10. Upon initiation of the construction of these reef units by the County's subcontractor, all liability. risk <br />of loss and responsibility for the safe handling, storage, transportation and deployment of the materials <br />shall be borne by the subcontractor. This liability, assumption of risk and responsibility shall remain with <br />the subcontractor until the materials are deployed at the permitted reef site in accordance with the <br />specifications in this Agreement - <br />PAYMENT SCHEDULE <br />Attachment A. Page 2 of 3 <br />