My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-013
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 11:40:01 AM
Creation date
2/9/2024 12:14:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/11/2000
Control Number
2000-013
Agenda Item Number
11.G.
Entity Name
Carter Associates
Subject
Master Agreement Work Order 4
Gifford Area Stormwater Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ail <br />EXHIBIT A <br />ITEMIZED MAN-HOUR ESTIMATE. <br />GIFFORD AREA STORMWATER IMPROVEMENTS <br />WORK ORDER NO.4 <br />INDIAN RIVER COUNTY PROJECT NO. 9219 <br />December 15, 1999 <br />A, F,D,03'. J.N.A. f'.xhihit,anrl'1'e:hni:alAv,i,t:rnn <br />Engineer 1 17 hr.. x $1 IS - $ 1.954-00 <br />Engineer 11 20111,' x $ x5 = S 1.700..00 <br />Word Ptroce,srrr t, hr". x S 10 = $ 1$4.00 <br />$ 3.835.00 <br />B. Topographic. Survey of Pro r._ t Area <br />Surveyor 1 <br />d hr •'. x $115 <br />= S 460,00 <br />Surveyor Il <br />Irl hr,, x 5 65 <br />S 650,00 <br />Crew (3 -man) <br />S6 hr,. x $ 90 <br />$ 5.040.00 <br />('ad Tech <br />48 hr, x 5 5r► <br />- S 2,400, <br />$ 8.550.00 <br />C. Schcdulr and Coordinate Soil Boring <br />1•:npinrcr II <br />2 hr,. x $85 <br />5 17t).00 <br />1). I:nvilunnit-ntal Repott, I'(.nnitlinf. <br />and Wetland Boundary Survey of off Site. Mitigation Area <br />Engineer 11 <br />6 hr,. x -> 8S <br />- 5 Sit)(A) <br />Surveyor 1 <br />3 his. x 51 15 <br />_ y 145.(M) <br />Crew (3 -marl) <br />40 his. x 5 9() <br />_ $ 3,600.1x) <br />('ad Tech <br />24 his x 5 50 <br />- $ 11,20000.�0y0 <br />G.K. Ilivironim- ltal (Sub-con"111t <br />int) <br />- S 3,500.W <br />$ 9,1550) <br />E. Permit Plans and Calculations <br />Engineer I <br />6 hrs. x $115 <br />- $ 690.00 <br />r'ngmeer If <br />120 hrs. x $ 85 <br />Engineer 111 <br />56 hrs. x $ 50 <br />$ 2,800.00 <br />Word Processor <br />12 hrs. x $ 30 <br />= $ _ 360.(X) <br />$14,050.(X) <br />F. Prepare Construction Plans, Specifications and Summary of Quantities <br />Engineer 1 <br />4 hrs. x $115 <br />= $ 460.00 <br />Engineer 11 <br />20 hrs. x $ SS <br />= $ 1,700.()() <br />Engineer 111 <br />16 hrs. x $ 50 <br />= $ 800.00 <br />Word Processor <br />4 hrs. x $ 30 <br />= $ 120.00 <br />$ 3,080.00 <br />J:\CYN\E.gGPROJ\IRCStormwtrMgmtlmprove\Gifford- EXHIBIT A-Attach.doe <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.