My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-045
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 1:59:22 PM
Creation date
2/13/2024 10:51:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/15/2000
Control Number
2000-045
Agenda Item Number
7.L.
Entity Name
Pointe West of Vero Beach, LTD
Subject
Contract for Construction of Required Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />R <br />POINTE WEST CONSTRUCTION ESTIMATE <br />POINTE WEST NORTH VILLAGE <br />SUB -TOTAL? <br />1 <br />PHASE 1 <br />$19.001 <br />24 -Jan -00 <br />014 1 R.C.P. 15" <br />- DRAINAGE <br />I <br />FELIX_ <br />I <br />ITEM DESCRIPTION PAGE. 1 <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />EXTENSION <br />$1,400.00 1 <br />$83,000.00 1 <br />Cit <br />MANHOLES <br />i EACH <br />ROADWAY <br />$1,500,00 1 <br />$21,000.00 1 <br />D3 <br />' CONTROL STRUCTURE <br />JEACHI <br />3 113,200.00 <br />1 <br />59 600.00 " <br />D4 <br />R1 GRADING <br />L.F. <br />8.670 <br />$3.50 <br />$23,345.00 <br />. STABILIZATION 8" <br />S.Y. <br />23,549 <br />$1.65 <br />$2,275_00 <br />_R2 <br />R2A COMPACTED SUB -GRADE <br />S.Y. <br />23.549: <br />$0.50 <br />$11.774.50 <br />R2AA SUB -BASE 3" MAT.FROM SITE <br />5,Y. <br />23,549 <br />$1.00 <br />323,549.00 <br />COQUINA 8" <br />S.Y. <br />19.994 <br />_ $5.00 <br />R.C.P. 48" <br />_R3 <br />R3A BASE 7" MAT.FROM SITE <br />S.Y. <br />19,994 <br />$2.50 <br />$49.985.00 <br />fR4 ASPHALT 1" <br />S.Y. <br />19.994 <br />$2.50 <br />R4A ,ASPHALT 1.5" <br />S.Y. <br />19,994. <br />$3.50 ' <br />$89.979.00 <br />R5 MOD. MIAMI CURB <br />L.F. <br />3,771 <br />55.90 <br />$20,740.50 <br />R6 ' TYPE "D" CURB <br />R7 TYPE "F" CURB _ <br />R8 ; SIDEWALK VX 4" <br />L..- 1 <br />: $- <br />1 L.F. ! <br />375 1 <br />9.569 1 <br />4,810 1 <br />$7,001 <br />$6.50 1 <br />$10.00 L <br />$2,625.00 <br />$62.198.50 <br />548.100.00 <br />_ <br />R9 SIDEWALK 4" X 4" <br />I L.F. <br />01 <br />$8.00 1 <br />R10 !CONCRETE 14'X 0" <br />I L.F. <br />0 1 <br />$28.00 1 <br />R11 SEED & MULCH <br />S.Y. <br />14.822 ! <br />$0.20 <br />$2.964.44 <br />R12 'SOD <br />S. F. : <br />40.363 ! <br />$0.17 .` <br />$6.861.71 <br />R13 ; STRIPING AND SIGNAGE <br />L.S. <br />1 1 <br />57,500.00 " <br />$7,500.00 <br />D13 R.C.P. 18" <br />SUB -TOTAL? <br />1 <br />815. <br />$19.001 <br />$327,622.65 <br />014 1 R.C.P. 15" <br />- DRAINAGE <br />I <br />6 <br />I <br />DBA ADS. 48" <br />0A-DS42" - - _ <br />_911 <br />D1 <br />INLETS <br />I EACH 1 <br />45 1 <br />$1,400.00 1 <br />$83,000.00 1 <br />Cit <br />MANHOLES <br />i EACH <br />141 <br />$1,500,00 1 <br />$21,000.00 1 <br />D3 <br />' CONTROL STRUCTURE <br />JEACHI <br />3 113,200.00 <br />1 <br />59 600.00 " <br />D4 <br />' ENDWALLS <br />IEACHI <br />01 <br />$19,00 <br />$15,485.00 <br />D5 <br />R.C.P. 84" <br />! L.F. <br />01 <br />$2,275_00 <br />D6 <br />. R.C.P. 60" <br />L.F. <br />335 1 <br />$93.001 <br />$31.155.0.0-1 <br />D7 <br />R.C.P. 54" <br />L.F. <br />7751 <br />$85.001 <br />$65,875.00 <br />D$ <br />R.C.P. 48" <br />L.F. <br />18551 <br />$56.00 <br />D9 <br />1 R.C.P. 42" <br />I L.F. 1 <br />0 <br />$55.00 1 <br />_ 010 <br />1 R.C.P. 36" _ <br />_ <br />L.F. <br />1,1091 <br />$42.001 <br />D11 <br />I R.C.P. 30" <br />L.F. <br />9101 <br />$34.00 <br />D12 <br />1 R.C.P. 24" <br />L.F. 1 <br />490 <br />$25.00 1 <br />D13 R.C.P. 18" <br />L.F. <br />815. <br />$19.001 <br />014 1 R.C.P. 15" <br />L.F. <br />175 1 <br />$18.50 <br />DBA ADS. 48" <br />0A-DS42" - - _ <br />_911 <br />L.F. <br />---- L.F. <br />1.7155 ' <br />0 1 <br />$52.00 ' <br />$48.00 <br />396.490.00 <br />$0.00 - <br />D10A IADS 36" <br />L.F. ! <br />1,109 f <br />'$34,00 ! <br />$37.706.00 1 <br />Dl IA !ADS 30" <br />L.F. <br />910. <br />$28.00 1 <br />$25,400.00 1 <br />012A i AOS 24" <br />L.F. <br />490 1 <br />$22.00? <br />$10,780.00 1 <br />013A :ADS 18" <br />L.F. <br />813 1 <br />$19,00 <br />$15,485.00 <br />_014A TADS 15" <br />L.F. <br />175 , <br />$13.00 1 <br />$2,275_00 <br />3US-TO T Ai-: <br />i378,815,OG <br />24 -Jan -00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.