My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t! <br />i <br />+0 <br />L-1 <br />B. The Contractor must exercise proper precaution to verify figures shown on <br />the drawings before layout work and will he held responsible for any error <br />resulting from his failure to exercise such precautions. <br />b. SAFETY AND HEALTH STANDARDS: <br />The performance of all construction under this Contract shall confornt to the <br />Federal Occupational Safety and Health Standards. <br />PRE -CONSTRUCTION CONFERENCE <br />A. Immediately following the written "Notice to Proceed" issued to the <br />Contractor, a Pre -Construction Conference shall be held with the Indian <br />River County Public Works Department to review coordination between <br />the Contractor and Indian River Counly. <br />B. In accordance with Paragraph 4, Part 1, of Section 1B, the Contractor shall <br />submit a planned construction progress schedule at the Pre -Construction <br />Conference. The schedule shall show the time at which the Contractor <br />plans to begin and complete each of the various sections, locations, or <br />phases of his operation. <br />S. NOTIFICATION OF AGENCIES REQUIRED: <br />A. The Contractor shall be responsible for notifying the following utility <br />companies prior to commencing work so that existing, utilities can be <br />located and protected: <br />1. Florida Power, A Light Company <br />2. Bell SouthTelephone Company <br />3. City of Vero Beach Water & Sewer Department <br />4. Indian River County Public Works Department <br />5. Johns Island Utilities Dept. <br />In addition, the Contractor shall be responsible for notifying the local <br />cable T.V, company, and any other utilities which may he affected by the <br />Contractor's work. <br />B. The Contractor shall he responsible for notifying the following agencies <br />prior to curl nutmeing worm. <br />1. Florida Department of Environmental Protection <br />2. St. John's River Water Management District <br />3. Indian River County Construction Inspector <br />4. Indian River County Code Enforcement Department (clearing). <br />i. hid ,jai River County Consumer Health & Relocative Services <br />Department (septic tank). <br />MIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.