My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4b <br />• <br />M <br />SECTION 2H - UTILITY CONDUITS <br />r 1. DESCRIPTION <br />i <br />A. Work under this heading consists of furnishing and installing conduits <br />tinder the roads at the locations shown on the Plans. <br />2. INSTALLATION <br />t A. The conduit shall be installed prior to the construction of the paving <br />subgrade. The conduit shall, unless otherwise noted, be PVC, SCH 40 <br />pipe. Unless otherwise noted, the conduit shall be 4 inch diameter and be <br />t installed with 42 inches cover at the centerline of the road. All conduit <br />V shall extend a minimum of four feet beyond the edge of the pavcattent or, <br />if there is a curb, the back of the curb. <br />I <br />B. The pipe shall be installed straight, level and in strict accordance with <br />the manufacturers recommendations. Backfill shall be compacted in <br />uniform layers to a minimum of WOIXe of maximum dry density per <br />AASHTO T -I8@. <br />3. LOCATION MARKING <br />A. The Contractor shall accurately mark the location and depth of the ends <br />of the conduits by a method which will allow the utility company to <br />readily locate the ends. The Contractor shall also deliver to the <br />l nginecr an "AS BUILT" drawing showing the location of the conduits <br />i with reference to man holes, street intersections, lot corners or other <br />permanent references. <br />1. AS-13UILT5 <br />A. During the installation of utility conduits the Contractor shall keep <br />accurate records of the As -Built construction showing the location and <br />burial depths of ;all utility conduits. All conduits shall be referenced <br />t frorn permanent objects such as manholes, valves, etc, Upon completion <br />of the project the Contractor shall deliver to the Engineer an As - <br />Built 'hawing showing the above infortnaluxn. <br />5. PAYMENT <br />A. Payment for this item shall be on a lineal toot basis Ian• each <br />diameter specified and shall include the cost of all labor, tools, materials, <br />compaction, and equipment necessary to complete the work in accordance <br />with the Plans and Specifications. <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.