My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />F-3 <br />4W <br />MM 7 <br />L, <br />5ECTIC7N 21+1 - PlPE AND FITTINGS F DR GRAVITY SEWER SYSTEM <br />t L SCOPE <br />A. This section describes the material and structural requirements for pipe, joints and <br />fittings to be used in construction of gravity sewerage systems as shown on the <br />Plans. <br />2. GENERAL <br />r A. The Contractor shall Furnish and install the pipe, fittings and structures as <br />shown on the Drawings and as specified herein. <br />B. Standards and specifications referenced herein shall be the current published <br />I edition. <br />` C. Unless otherwise rioted or 'approved by the Engineer, all materials/equipment of <br />I a particular type, size, or class shall be by a single manufacturer and shall be of <br />i <br />the same model or series. <br />D. The Contractor shall provide to the Engineer upon request a written <br />7 certification that all materials furnished by him have been manufactured, <br />inspected, and testers in accordance with the applicable specification and/or <br />standard. <br />E. All pipe, fittings and appurtenances shall be new and in good condition, free <br />from damage or defects. and maintained in such condition until incorporated in <br />the finished work. <br />F. Any or all materials found during [lie progress of the work to have cracks, <br />flaws, or other defects which, in the judgement of the Engineer, would cause <br />q leakage, rupture, or otherwise impair tiie quality of the finished work may be <br />rejected by the Engineer. Rejected materials will be immediately segregated from <br />acceptable materials, marked as "REJECTED". and removed from tiie job site by <br />the Contractor without delay. <br />" 3. PIPE AND Fl7rlNGS <br />F A. PVC PIPE AND FITTINGS <br />1) Unless otherwise noted' in the Plans. PVC pipe and ftttini; shall he Type <br />PSM, SDR 35, push -on joint with thickened integral bell and <br />elastomeric gasket, con forming to ASTM D3034. The pipe shall have a <br />standard laying length of 12.5 feet or 20 feet. Necessary sittings and <br />adapters shall be supplied by the same manufacturer as the PVC pipe and <br />shall he compatible with all other SDR 35 pipe. Joint4 shall conform m <br />t _ ASTM D3212. Connections to pipes of other materials or to pipes with <br />dimensions not compatible with SDR 35 pipe shall be made using <br />flexible couplings with stainless steel tightening bands as manufactured <br />by Fernco, Inc., or Mission Rubber Co., Inc. or Joints, /tic. <br />B. DUCTI LE IRON PIPE AND Hill NQS <br />i 1) Ductile, it -on pipe shall meet all manufacturing, and testing regUirements <br />of AWWA C1.51. with Ptssli-nn or inechanic-A ;mints con(Ortnin-L to <br />:ra. i <br />i <br />i+. <br />
The URL can be used to link to this page
Your browser does not support the video tag.