My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />C_] <br />C-1 <br />shall be cured by placing a berm of moist earth against them or by arty <br />of the methods described below, for the remainder of the 7 day curing <br />period. <br />1) Wet Burlap Method: Burlap shall be placed over the entire <br />exposed surface of the concrete with sufficient extension beyond <br />each side to insure complete coverage. Adjacent strips shall <br />be overlapped a minimum of six inches. The burlap shall be <br />held securely in place such that it will be in continuous contact <br />with the concrete at all times and no earth shall he permitter) <br />between the burlap surfaces at laps or between the burlap and <br />the concrete. The burlap shall be kept thoroughly wet throughout <br />i the curing period. <br />2) Membrane Curing Method: Clear membrane curing compound <br />or white -pigmented curing compound shall be applied by hand <br />sprayer in a single -coal continuous film at a Uniform coverage <br />of at least one gallon to each 200 square feel. Any cracks, <br />Y checks or other defects appearing in the coating shall be <br />recoated immediately. The curing compound shall he thoroughly <br />agitated in the drum prior to application, and during <br />application as necessary to prevent settlement of the pigment. <br />3) 'polyethylene Sheeting Method: Polyethylene sheeting shall he <br />placed over the: entire exposed surface of the concrete, with <br />sufficient extension beyond each side to insure complete <br />coverage. Adjacent strips shall be overlapped a minimum of six <br />inches. The sheeting shrill be held securely it) place such that it <br />will be in continuous contact with the concrete as all tinges. <br />IA.i <br />
The URL can be used to link to this page
Your browser does not support the video tag.