My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />4M <br />t - <br />will be returned; if the successful Bidder fails to execute and deliver the Agreement <br />and furnish the required Contract Security within 15 days of the Notice of Award, <br />Owner may annul the Notice of Award and the Bid Security of that Bidder will be <br />forfeited. The Bid Security of any Bidder whom [honer believes to have a reasonable <br />chance of receiving tate award may be retained by Owner until the earlier of the <br />seventh day atter the "effective date of the Agreement" (which term is defined in the <br />General Conditions) and the required Contract Security is furnished or the sixty-first <br />t day alter the Bid opening. Bid Security of other Bidders will be returned within sixty <br />days of the Bid opening. <br />Y <br />Y 7. ['nrttmat Ti= <br />I The number of days within which, or the date by which, the Work is to be completed (the <br />1 Contract Time) is set forth in the Bid Form and will be included in the Agreement. <br />l 8. 1 _ quida ed Damages <br />i It is understood and agreed that if the project is not completed within the contract time, the <br />! County will apply liquidated damages. The amount of damages is set forth in the Bid Form <br />t and will be included in the Agreement. The damages will be deducted from monies due the <br />Contractor, not to exceed the total contract price. <br />{ 9, Substitute Mater" l and Equipment <br />t The Contract, if awarded, will be on the basis of material and equipment described in the <br />I Drawings or specified in the Specifications without consideration of possible substitute or <br />"or -equal" items. Whenever it is indicated in the Drawings or specified in the Specifications <br />I that a substitute or "or -equal" item of material or equipment may be furnished or used by <br />Contractor if acceptable to Engineer, application for such acceptance will not be considered <br />I by Engineer until after the "effective date of the Agreement". The procedure for submittal <br />of any such application by Contractor and consideration by Engineer is set forth in Paragraph <br />6.1 of the General Conditions. <br />10. SuhcD= tors, etc. <br />I 10.1. The General Conditions require the identity of certain Subcontractors and other <br />persons and organizations to be submitted to Owner in advance of the Notice of <br />r Award. The apparent Successful Bidder, and any other Bidder so requested. â– will <br />within seven days after the day of the Bid opening submit to Owner a list of all <br />Subcontractors and other persons and organizations (including those who are to <br />y furnish the principal items of material and equipment) proposed for those portions <br />s of the Work as to which such identification is so required. Such list shall be <br />accompanied by an experience statement with pertinent information as to similar <br />I projects and other evidence of qualification for each such Subcontractor, person and <br />t organization ifrcquested by Owner. If Owner or Engineer atter due investigation has <br />reasonable objection to any proposed S01contractor, other person or organization, <br />either may before giving the Notice of Award request the apparent Successful Bidder <br />to submit an acceptable substitute without an i9crease in Bid price. If the apparent <br />Successful Bidder declines to make any such substitution, the contract shall not be <br />awarded to such Bidder, but his declining to make any such substitution will not <br />r. <br />Bit) PROPOSAL <br />IR 1 <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.