Laserfiche WebLink
II <br />40 <br />40 <br />ENGINEER shall have no responsibility to review or check the BIDDER'S compliance with <br />the Trench Safety Standards. <br />7. The BINDER has allocated and included in its bid the total amount of S!1%ot)`L. based on <br />1 the square feet of shoring to be used for compliance with shoring safety requirements and <br />intends to comply with said shoring requirements by instituting the following specific <br />method(s) of compliance on this Project: <br />1 The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the Excavation Contractor, Such methods will not be checked by the <br />1 OWNER or ENGINEER for accuracy, completeness or any other purpose. The OWNER <br />and ENGINEER shall have not responsibility to review or check the BIDDER'S compliance <br />with the Trench Safety Standards. <br />l 8. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said geotechnical information and that, based <br />on such information and the BIDDER'S own information, the BIDDER has sufFicient <br />knowledge of the Project's surface and subsurface site conditions and characterigtics to assure <br />BIDDER'S compliance with the applicable Trench Safety Standards in designing the trench <br />safety systems) for the Project. <br />BIDDER <br />By <br />(Signature) ' <br />{ (Position or.Tille) <br />(Bale) <br />Y <br />SWORN TO AND SUBSCRIBED before me flifi day of 2000. <br />I My Commission Expires. K2s tt *'• 4 �u rnn c Keunnann <br />* my Commiss!orn CC735M1 <br />110es APA 21. 2M <br />N tY Public <br />rRENCtt STAIVNIE:Ni- t <br />T-2 <br />e <br />