Laserfiche WebLink
• <br />C-1 <br />• <br />L J <br />2.03 Private Lift Station, Water, Sewer, & Misc. Details (Sheet C-5) <br />A. Three phase power is n_91 available. Modify pump electrical specifications <br />accordingly. <br />2.04 Restroom Plan and Elevations (Sheet A-1) <br />" A. Modified Floor plan with accessory markings, and Restroom Accessory <br />Schedule (attached) are hereby incorporated by reference. <br />B. Clarification: cedar inside and out shall be allowed to weather naturally (no <br />sealer, stain, or paint). <br />C. All exposed masonry shall receive 3 coat stucco (scratch, brown, and finish) <br />r and 3 coat paint finish (primer + 2 coats). <br />2.05 Restroom Sections (Sheet A-2) <br />A. Delete floor and wall tile. Add 2 coats of hard coat plaster over DuraRock <br />wall board. <br />B. floor shall receive DuraQuartz epoxy resin flooring system with integral cove <br />base. <br />" C. Apply sealer and 2 coats of epoxy paint on wails. <br />D. Typical bathhouse doors shall have mortised hardware, and a lock hasp. All <br />hardware shall be 316 stainless steel. (Note: this application to match that <br />" used at Treasure Shores park, if bidders desire to visit that site.) <br />a 2.06 Technical Specifications <br />A. Insert Section 8A, Hardware and Specialties (attached) <br />f 2.07 Structural Plans (Sheet ST -1) <br />A. Modify Typical pile Cap Detail to indicate a 1diameter pile, not 16". <br />ADDENDUM NO. <br />