Laserfiche WebLink
40 <br />40 <br />40 <br />Drawings -Tie drawings which show the character and scope of the Work to be performed and which have <br />been prepared or approved by ENGINEER and are referred to in the Contract Documents. <br />Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but <br />if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of <br />the two parties to sign and deliver. <br />ENGINEER - Public Works Director (or his designee) <br />Department of Public Works <br />Indian River County, Florida <br />1844 25's Street <br />Vero Beach, Fl. 32960 <br />Field Order - A written order issued by ENGINEER which orders minor changes in the work in accordance <br />with paragraph 9.5 but which does not involve a change in the Contract Price or the Contract Time. <br />General Requirements - Sections of Division 1 of the Specifications. <br />Laws and Regulations; Laws or Regulations - Laws, rules, regulations, ordinances, codes and/or orders. <br />Notice of Award - The written notice by OWNER to the apparent successful bidder stating; that upon <br />compliance by the apparent successful bidder with the conditions precedent enumerated therein, within the <br />time specified, OWNER will sign and deliver the Agreement. <br />Notice to Proceed - A written notice given by OWNER to CONTRACTOR (with a copy to ENGINEER) <br />fixing the date on which the Contract Time will commence to run and on which CONTRACTOR shall start <br />to perform CONTRACTOR'S obligations under the Contract Documents. <br />OWNER - Indian River County, Florida <br />1840 25" Street <br />Vero Beach, FL. 329610 <br />Partial Utilization - Placing a portion of the Work in service for the purpose for which it is intended (or a <br />related purpose) before reaching Substantial Completion for all the Work. <br />Project - The total construction of which the Work to be provided under the Contract Documents may be <br />the whole, or a part as indicated elsewhere in the Contract Documents. <br />Resident Project Representative - The authorircd representative of ENGINEER who is assigmcd to the site <br />or any part thereof. <br />Shap Drawing - All drawings, diagrams, illustrations, schedules and other data which are specifically <br />prepared by or for CONTRACTOR to illustrate some portion of the Work and all illustrations, brochures, <br />standard schedules, performance charts, instructions, diagrams and other information prepared by a Supplier <br />and submitted by CONTRACTOR to illustrate material or equipment for sonic portion ol'the Work. <br />Specifications - "I"tose portions ui the Contract cunsisiing of written te.chr.ical descriptions of <br />materials, equipment, construction systems, standards and workmanship as applied to the Work and certain <br />administrative details applicable thereto. <br />Subcontractor - An individual, firm or corporation having a direct contract with CONTRACTOR or with <br />any other Subcontractor for the performance of a part of the Work at the site. <br />Gf'NERAL CONDITiONS <br />GG - 2 <br />