4D <br />4M <br />As indicated in paragraphs 11.2 and 12. 1, Contract Price and Contract Time may only he changed <br />by a Change Order or a Written Amendment. <br />3.5 In addition, the requirements of the Contract Documents may be supplemented, and minor variations <br />and deviations in the Work may be authorized, in one or more of the following ways: <br />3.5.1 a Field Order (pursuant to paragraph 9.5), <br />3.5.2 ENGINEER's review of a shop drawing or sample (pursuant to paragraphs 6.32 and 6.33), <br />or <br />:3.5.3 ENGINEER's written interpretation or clarification (pursuant to paragraph 9.4). <br />Reuse of Documents - <br />3.6 Neither Cato TRACTOR nor any Subcontractor or Supplier or other person or organization <br />performing or furnishing any of the Work under a direct or indirect contract with OWNER shall <br />have or acquire any title to or ownership rights in any of the Drawings, Specifications or other <br />documents (or copies of any thereof) prepared by or hearing the seal of ENGINEER; and they shall <br />not reuse any of them on extensions of the Project or any other project without written consent of <br />OWNER and ENGINEER and specific written verification or adaptation by ENGINEER. <br />ARTICLE 4 - AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS <br />Availability of Lands: <br />4.1 OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the Work is <br />to be performed, rights-of-way and easements for access thereto, and such other lands which are <br />designated for the use of CONTRACTOR. Easements for permanent structures or permanent <br />changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided <br />in the Contract Documents. IF CONTRACTOR believes that any delay in OWNER's furnishing <br />these lands, right-of-way or casements entitles CONTRACTOR to an extension of the Contract <br />Time, CONTRAC'T'OR may make a claim therefor as provided in article 12. CONTRACTOR shall <br />provide for all additional lands and access thereto that may be required for temporary construction <br />facilities or storage of materials and equipment. <br />Physical Conditions/Available Deports: <br />4.2 Exploration and Reports; Reference is made in the Supplementary Conditions for identification of <br />those reports of exploration and tests of subsurface conditions at the site that have been utilired by <br />ENGINEER in preparation of the Contract Documents. Stich reports are not guaranteed as to <br />accuracy or completeness and are not part of the Contract Documents. <br />4.3 Unforeseen C'onditirnn-v CONTRACTOR shall promptly notify OWNER and ENGINEER in writing <br />or any subsurface or latent physical conditions at the site or in an existing structure differing <br />materially from those indicated or referred to in the Contract Documents. EN61Nl ER will <br />promptly review those conditions and advise OWNER in writing; if further investigation or tests are <br />necessary. <br />Promptly thereafter, OWNER shall obtain the necessary additional investigations and tests and <br />furnish copies to ENGINEER and CONTRAC"FOR, trENGINEI R finds that the results or such <br />investigations or tests indicate that there are :subsurtace or talent physical conditions which dilTer <br />materially from those intended in the Contract Pojuinents, and which could not reasonably have <br />GENliRAt. C ONDUNONS <br />r3C - 6 <br />