My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-059
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 1:56:46 PM
Creation date
2/15/2024 10:32:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/07/2000
Control Number
2000-059
Agenda Item Number
11.G.1.
Entity Name
Keith & Schnars, Inc.
Subject
Amendment # for Professional Engineering Agreement
4th Street Widening , Drainage Improvements & Intersection Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4D <br />40 <br />AMENDMENT NO. 3 <br />4T" STREET WIDENING, DRAINAGE IMPROVEMENTS <br />AND INTERSECTION IMPROVEMENTS <br />This is an amendment to the Professional Engineering Agreement (AGREEMENT) dated January <br />4. 1995 <br />SECTION If - SCOPE OF SERVICES <br />The CONSULTANT agrees to perform the additional professional services described below: <br />A. Widen sidewalks from 5' to 6throughout the project. Relocate sidewalks away from back <br />of curb, where existing right-of-way permits. Provide additional sidewalk on the south side <br />of 4'" Street, west of Old Dixie Highway. <br />B. Revise design drawings and drainage calculations to accommodate restrictions imposed by <br />actual right-of-way acquired. Add drainage facilities at SE comer of 4'h Street and Old <br />Dixie. Update design drawing to indicate actual right-of-way and Temporary Construction <br />Easements acquired in lieu of notations for "proposed right-of-way". <br />C. Show all buried utilities on cross sections and include utility information. <br />D. Continue and complete coordination with Florida East Coast Railway for railroad crossing <br />rehabilitation. <br />A. Compensation for services outlined above will be in lump sum amount of $9,350.00. <br />B. Revise Section V.1 of Master Agreement: <br />The total Not -to -Exceed amount of $73,657.00 is hereby changed to $83,007.00. <br />A. Receipt of an, executed copy of the Amendment shall constitute tate CO[ NIT ,"S .notice to <br />the CONSULTANT to proceed with the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.