Laserfiche WebLink
40 <br />40 <br />Mr. Stephen Doyle, lune 30, 1999, Page 2 <br />C®� Kimley-Hom <br />�® and Associates, Inc. <br />SCOPE OF SERVICES <br />Task 1: Research and Recovery <br />Site reconnaissance for the recovery of horizontal and vertical control <br />(NGVD 1929) and ties to the State Plane Coordinate System, Florida East <br />Zone (NAD 83/90). <br />Classification Man flours Rate Subtotal <br />Surve Crew 10 80 $800.00 <br />Task 2: Records Research <br />Research at the Indian River County Courthouse, Property Appraisers' Office, <br />Utilities, Engineering, Surveying, and Right -of -Way Departments for <br />applicable records in an effort to establish road and canal right-of-ways, <br />existing easements, horizontal and vertical project control, property lines, and <br />ownerships. <br />Classification Man Hours Rate Subtotal <br />Professional Surveyor 20 80 $1,600.00 <br />Task 3: Location of Constructed Improvements and Utilities within the Project Limits <br />This task will include the field location of the improvements within the <br />proposed effluent line corridor. More specifically, the topographic survey <br />will be limited to the following areas within the corridor. Full right-of-way of <br />Hobart Road; west edge of pavement to east right-of-way line of Kings <br />Highway; south edge of pavement to north right-of-way line of CR 510; full <br />right-of-way of 55th Avenue; full right-of-way of 87th Street; full right-of- <br />way of 58th Avenue lying north of CR 510. Cross-sections will be obtained <br />at 1000' intervals and elevations will be shown at potential conflict areas. <br />ClassificationMan Hours Rate Subtotal <br />Professional Surveyor 1 25 80 1 $2,000.00 <br />Survey Crew 80 80 1 $6,400.00 <br />Task 4: Preparation of Final Survey Report/Base Map <br />itrrn completion of the fi�id data acquisition, field note reduction, and <br />position computations, the final topographic survey/base map will be prepared <br />at a scale of V = 40'. <br />Classification <br />Man Hours <br />Rate <br />Subtotal <br />CADD Operator <br />40 <br />70 <br />$2,800.00 <br />Surveyor <br />25 <br />80 1 <br />12�,`w"0.W <br />_Professional <br />Survey Technician <br />r 30_ <br />45 <br />$1,350.00 <br />Survey Crew <br />1� <br />='J i <br />S801J.00 <br />