My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/13/1996
CBCC
>
Meetings
>
1990's
>
1996
>
8/13/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:50 PM
Creation date
6/17/2015 9:55:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner TipPin, the Board unanimously approved <br />the Grant Agreement with St. Johns River Water <br />Management District to construct a reverse osmosis <br />water treatment plant and wellfield, as recommended <br />by staff. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE <br />CLERK TO THE BOARD <br />WABASSO QUICK MART - GENERAL EQUITIES, INC. DEVELOPER'S <br />AGREEMENT <br />The Board reviewed a Memorandum of July 31, 1996: <br />DATE: JULY 31, 1996 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. , E. <br />AND STAFFED CAPITAL ENGINEER <br />BY: DEP O UTILITY SERVICES <br />SUBJECT: WABASSO QUICK MART, GENERAL EQUITIES INC. <br />DEVELOPER'S AGREEMENT <br />In keeping with the County policy of logical extension of utility <br />lines and the comprehensive plan requirement for water service to <br />a project of this size and type, we are proposing a Developer's <br />Agreement for a water line extension. The County Utilities <br />Department has recently completed construction of the master <br />planned water mains on U.S. Highway One in Wabasso. The proposed <br />Quick Mart is bordered by CR 510 and 86th Place (Poinsettia <br />Boulevard).-. For details of existing water mains and proposed water <br />lines (see attached Developer's Agreement and location map). <br />ANALYSIS <br />The proposed water line construction consists of 605 L.F. of 8° <br />water main, as described in the attached Developer's Agreement. <br />The total estimated projects cost is $29,862.00, the developer's <br />share is $3,645.00 and the County's portion is $26,217.00 (see <br />attached Developer's Agreement for details of the proposed cost <br />sharing). A portion of the County's contribution will ultimately <br />be recovered through the line extension fee as additional customers <br />connect.-- Funding for this project will be from the impact fee <br />account. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the proposed Developer's <br />Agreement with General Equities as presented. <br />AUGUST 13, 1996 59 BOOK _ F'' - 80' C <br />
The URL can be used to link to this page
Your browser does not support the video tag.