Laserfiche WebLink
Task # <br />8.0 <br />Senior Senior <br />� 15.0 <br />� 9.0 32.0 <br />$5,675 <br />Calculations <br />I <br />Task.-anager <br />Project Engineer/ <br />Engineer <br />anner <br />I <br />Hours Per T -t <br />k <br />• 0• <br />1 <br />r»� <br />Fee Schedule <br />12.0 <br />22.0 <br />18.0 <br />52.0: <br />$8,930. <br />Preparation <br />Prepare Draft and Final <br />16.0 <br />18.0 <br />6.0 <br />6.0 <br />1.0 <br />47.0 <br />$8,812 <br />Reports <br />AND <br />,q,—,tmEETINGPRESENTS <br />., ATtC►NS <br />. <br />..K <br />- . <br />Kick-off Meeting (Virtual) <br />3.0: <br />3.0 <br />3.0 <br />1.0 <br />10.0 <br />$1,752 l <br />Draft Report Review <br />6.0 <br />4.0 <br />1 <br />4.0. <br />1.0 . <br />15.0 <br />$2,9021 <br />Meeting (virtual) <br />Three Additional Meet - <br />30.0 <br />6.0 <br />6.0 <br />1.0 <br />43.0 <br />$10,512 <br />Ings <br />- <br />j . <br />, <br />l <br />4 <br />r <br />i <br />j <br />j <br />} <br />i <br />V <br />V <br />Administrative -Cost <br />8.0 <br />� 15.0 <br />� 9.0 32.0 <br />$5,675 <br />Calculations <br />I <br />,,. b@fl@SCh Indian River County /I Impact Fee Study Up� 30 <br />i <br />