My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-250A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-250A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:13:37 AM
Creation date
2/26/2024 11:12:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Lease
Approved Date
11/07/2023
Control Number
2023-250A
Agenda Item Number
15.B.4.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Lease Agreement of SWDD Property for the Oslo Road Widening and I-95 Interchange Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or intended use. Halley shall not use the Premises for any other purpose without the prior written <br />approval of the SWDD. Halley shall not use any other portion of the SWDD Property without the <br />prior written approval of the SWDD. Haley shall clear, level, and stabilize the Lease area at their <br />own cost. The existing culvert running parallel to Oslo Road needs to be evaluated by a <br />civil/structural engineer at Halley's expense to establish a baseline condition. Upon completion <br />of this lease Agreement, Halley would re-evaluate the existing culvert condition to determine if <br />any structural degradation has occurred. If determined that damage has occurred, then replacement <br />of culvert shall be at Halley's expense. Replacement means that it must meet or exceed current <br />culvert capacity and current building codes. This is inclusive of all labor, equipment, materials, <br />permits and engineering as required. <br />7. Declared Emergenc <br />In the event of a declared emergency, County/SWDD shall give Halley as much advanced notice <br />as is practicable to exercise its right to use the leased premises. The County/SWDD would have <br />priority to use the site as a Disaster Debris Management Site and Halley's access to the Premises <br />may be restricted during this period. During County's/SWDD's use of the leased premises, <br />Halley's duty to pay rent shall be abated on a prorated basis. <br />8. Rent <br />Halley agrees to pay to the SWDD rent in the amount of $600.00 per month for the Term of the <br />Lease plus all applicable sales, use and like taxes, for the use of the Premises as set forth in this <br />Lease. Each monthly payment is due in full on or before the fifteenth (15th) day of the month. If <br />full payment is not received by the SWDD on or before the fifteenth (15th) day of each month, and <br />SWDD has not agreed in writing to accept partial and/or late payment, a late fee equal to five (5) <br />percent of the rent amount shall be due for each day the rent is late. Payments shall be made <br />payable to "SWDD" and shall be delivered to Indian River County Landfill, 1325 74th Ave SW, <br />Vero Beach, FL 32960. <br />9. Holding Over. <br />If Halley does not vacate the Premises upon the expiration or termination of this Lease without <br />first obtaining the written consent of SWDD to remain in the Premises, such holding over shall <br />constitute, and be construed as, at SWDD's option, a month-to-month tenancy or a tenancy at <br />SWDD Lease with HEC - Final 09-26-23 <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.