My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-080
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:08:57 AM
Creation date
2/27/2024 10:07:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
03/21/2000
Control Number
2000-080
Agenda Item Number
11.G4.
Entity Name
Dr. Ralph Rosato
Subject
Addendum to Health Insurance Guranty of Payment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i <br />i <br />HANSON <br />ENGINEERS <br />INCORPORATED <br />Engincors, A Pvbirects & SrienIisrs <br />December 30, 1999 <br />�1 <br />Mr. James W. Davis, P.E. ` <br />Indian River County Public Works <br />1840 251` Street <br />Vero Beach, FI.. 32960 <br />Re: Revised Report and Proposal - Indian River County <br />Public Works Maintenance Complex and <br />School District Fleet Maintenance Facility <br />HEI Project No, 97FB232 <br />Dear Jim, <br />3,-,N 1' " <br />We have revised the "Needs Analysis Report" and the proposal letter pursuant to our <br />conversation. Upon further evaluation of the Building Program, we found areas of square footage <br />allocations that may be reduced or combined, in an effort to bring the project closer to the present <br />conMction budget. <br />The original User surveys requested square footage needs and increases. These square footage <br />allotments are reflected in the original program and needs definition, <br />The revised Needs Analysis (enclosed) references areas to be reduced and/or shared by the Public <br />Works and School District. Refer to pages 10 and 12 of the Report. In a few cases the program areas <br />were not increased beyond what the School District is currently using and the 10% growth factor has been <br />omitted. <br />During the next phase of the project, which includes preliminary design, we will take a second <br />look at these area reductions. Since we have developed preliminary floor plans, we will "test" the <br />construction budget established as part of the Ycject programming and development phases. <br />Please review the enclosed and call me with any questions. We are anxious to start work on this <br />project. <br />Sincerely, <br />MANS+*?' ENGINE R5 ii\-:C0RPUIfA`fl;tD <br />W �Knnit, <br />5teve�n.A�� <br />Assistant Vice President <br />S WK/mf <br />cc: Robert J. Knoedler, P.E., CEM <br />William C. Bradrord, 1'.E. <br />Project Files <br />1601 Belvedere Road, Suite 363 Smith • "1Wesc Palm Beach, FL 33406 • (56047 1-9170 • rax: t56 i Y 471-4369 <br />TBOW7961 AANA116 1t3tRM058 <br />H:\ProjectslMiscljimdavis.doc Offices nationwide wwtiw.ls;ursvoenginl r rs.t uny <br />PIIr11L1i irirrY'.Y'1 ;"LIQ'• <br />
The URL can be used to link to this page
Your browser does not support the video tag.