My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-080
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:08:57 AM
Creation date
2/27/2024 10:07:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
03/21/2000
Control Number
2000-080
Agenda Item Number
11.G4.
Entity Name
Dr. Ralph Rosato
Subject
Addendum to Health Insurance Guranty of Payment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C_J <br />40 <br />40 <br />40 <br />This fee proposal is nresented in accordance with the following: <br />1. The professional services are to be provided in accordance with gcnerally accepted <br />professional engineering/architectural practices; no other warranty is either expressed or <br />implied. <br />2. Nothing contained in this agreement shall create a contractual relationship with or a cause <br />of action in favor of a third party against either the Owner or the ArclritectlEngincer. <br />3. The Engineer/Arebitect shall not have control over or charge of and shall not be <br />responsible for construction means, methods, techniques, sequences or procedures, or for <br />safety precautions and programs in connection with the Work, since these are solely the <br />Contractor's responsibility under the Contract for Construction. The Engineer/Architect <br />shall not be responsible for Contractor's schedules or failure to carry out the work in <br />accordance with the Contract, Subcontractors, or their agents or employces, or of any other <br />persons performing portions of the work. <br />4. While HANSON will prepare an estimate of probable construction cost, this estimate is <br />based upon our experience in the industry, and many factors may adversely influence the <br />Contractor's pricing. Thus, HANSON can not and will not warrant that the bids for this <br />project will not exceed our construction estimate, <br />S. Invoicing will be submitted on a monthly basis for work completed to date. Payment is due <br />upon receipt of invoice. <br />Please review the enclosed information and notify me if you require any additional <br />back-up information. <br />We are looking forward .o beginning the schematic design phase for the Indian River <br />County Public Works & Fleet Maintenance and School District Maintenance Facilities. <br />Sincerely, <br />HANSON ENGINEERS INCORPORATED <br />c �J�U W37r,��- <br />Steven W, Knight, R.A. <br />SWIUjc Assistant Vice President <br />Enclosure <br />cc: Robert J. Knoedler, P.E., CEM <br />William C. Bradford, P.E. <br />;Iroject riles <br />IiANSON <br />ENGINEERS <br />irHANSONMATATROJECrSISWKDAVIS.DOC 0-,,muoanwgrcapope, <br />
The URL can be used to link to this page
Your browser does not support the video tag.