40 <br />i <br />i <br />40 <br />SCHEDULE & D LIVE'RABLES: <br />A. The following is a sunuttaty Of major milestones and :mticipalcd tintefrtmes for the <br />project: <br />1) Pre -Design Services..........................................................8 weeks <br />a) Minutes of Pre -Design Workshop <br />b) Budget Summary (Opinion of Tolal Project Coasts) <br />2) Site Inventory....................................................................4 weeks <br />a) Site Survey <br />b) ,lurisdictionai wetland delineation <br />c) Welland report <br />3) Architectural reaturc Programming & Schematics .........,.3 weeks <br />a) Written architectural design i'rogrant <br />Ill Sciteniatic archileclural designs ({clan & clev.) <br />4) Master Planning................................................................8 weeks <br />a) Preliminary Master Plan <br />b) final Illustrative Master Plan (30% design submittal) <br />5) Pre -application meetings...................................................3 weeks <br />a) Conference report <br />6) Public Meeting..................................................................2 weeks <br />a) Workshop summary report <br />7) Preliminary Design Phase.......... ............ .......................... 6 weeks <br />a) 60% design submittal <br />b) Preliminary opinion o>l' Probable Construction Costs <br />8) Permilting......................................................................... 13 weeks <br />a) Copies of permit applications <br />9) Final Design Phase...........................................................12 weeks <br />a) 90% dctiign Sttbntival <br />b) Technical specifications <br />c) finatl olyinion ol" Probable Cotislructiolt Casts <br />d) l t)o% dt-sign submittal (dwgs. & specs.) <br />10) Bidding Phase Services.....................................................6 weeks <br />a) Bid form <br />b) Comments regarding bids received <br />1 l) Construction Phase Services.............................................24 weeks <br />a) 8 field Reports <br />b) As -Built Survey <br />B. The above timeframes are excluding time for County review and comment. <br />C. Completion of construction is,"' tic i pated tin or before ttsid-May, 2Q)1. <br />9. FEE ARRANGI MI NT: <br />The County agrees to pay the landscape Architect for prol'cssional services (Tasks 1-9) <br />as follows: <br />A lump sini of Two Hundred forty Nine Thousand, Seventy <br />Dollars ($249,070.00), <br />according to the following schedule o1 values: <br />Task 1 — Site Inventory (Survey & Environmental) <br />$18,720.00 <br />Task 2 — Architectural feature Prog;rammirig & Schematics <br />$14,000.tit) <br />Task 3 — Master Pluming <br />$40,850.00 <br />Task 4 — Pre -Application Meetings <br />$1,500.00 <br />Task 5 — Public Meeting; <br />$3,10-5.00 <br />Task 6— Preliminary Design Phase Services <br />$54,750.00 <br />Task 7 — Permitting <br />$10.655.00 <br />Atlat'11111Cni- 10 <br />