Laserfiche WebLink
•/ <br />ab <br />I-] <br />40 <br />L-3 <br />Twelve signed and sealed copies of the survey report shall be provided. <br />Task 300 -- COMPUTERIZED VOLUMETRIC MODELING <br />With the design plans that show the configuration of each landfill site at build -out, CDM <br />will perform volumetric modeling of Segment 11, the Will, and the C&D sites. The results <br />will be provided in the Financial Assurance report that specifically identifies the total <br />airspace available in each landfill area, based on construction and design criteria. <br />Volumetric modeling of the total airspace available using a three-dimensional civil <br />software package is more accurate than spreadsheet estimates. This will allow a better <br />estimate of the remaining life of both the Class I Landfill and the C&D Landfill. <br />For the Class I landfill, the report shall include an evaluation of the compaction of the <br />waste and an analysis as to whether Waste Management is meeting its contractuai <br />compaction requirements. For the C&D site, an evaluation of foot print and side slopes <br />shall be provided, with an analysis as to whether the site is being operated and constructed <br />in accordance with the permitted design. <br />SCHEDULE <br />It is estimated that it will take approximately four months from the time that CDM receives <br />notice to proceed to complete the work outlined in Tasks 100, 200, and 3010. The survey <br />will be field documented by July 1, 2000, and the subsequent survey and survey report <br />will be completed by August 1, 2000. The completed Financial Assurance Report will be <br />completed by September 1, 2000. <br />B-2 <br />