My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
01/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:17:49 AM
Creation date
2/29/2024 9:58:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
597
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ardaman & Associates, Inc. 460 NW Concourse Place, Unit 1 <br />Port St. Lucie, Florida 34986 <br />Geotechnical, Environmental and 772-878-0072 (office) <br />Materials Consultants 772-878-0097 (fax) <br />www.ardaman.com <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 12/3/23 through 12/2/25) <br />SPECIAL DRILLING/SOUNDING <br />Prices for special drilling (barge drilling; air boat sampling; amphibious drilling: NQ wire line wring: large diameter borings; <br />drilling in corrosive, contaminated or hazardous materials: drilling at great depths; installing large diameter temporary <br />casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project. <br />OTHER DRILL RIG CHARGES <br />Disposable Teflon Bailer .......... ................................................................................................. <br />Clearing Difficult Access, Hole Location and Set-Up.......................::.:.......................................:...................... <br />$286.00/hour <br />Standby Time (drillers)...................................................................................................................................... <br />$286.00/hour <br />Piezometer and Well Installation (plus materials).........................................................:................................... <br />$286.00/hour <br />Bore Hole Grouting and Sealing (plus materials) ........................... ... ..... $286.00/hour <br />................................... ........................ <br />Materials.........................................................:................................................................................................... <br />Cost+ 15% <br />Barge Borings........................................................................................................................ <br />Normal drilling rates times 1.5 <br />ATVBorings... ............................................................................................................. i .......... <br />Normal drilling rates times 1.5 <br />INSTRUMENTATION <br />Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and <br />packer tests will be determined per project. <br />ENVIRONMENTAL SITE ASSESSMENTS <br />GENERAL FIELD EQUIPMENT: <br />Phase I Environmental Site Assessments <br />Generator.............................................................................:.......................:.................................................... $111.00/day <br />.. <br />Steam Cleaner..................................................................................................................................... .............. $111.00/day <br />Surveying Equipment (Water Table Elevations) ......................................... :......................................................... <br />$74.00/day <br />PeristalticPurging Pump.....................................................................................................................,............... <br />$56.00/day <br />pH/Conductivity Meter......................................................................................................................................... $38.00/day <br />TurbidityMeter .... ................................................................................................................................................. <br />$62.00/day <br />Water Level Indicator........................................................................................................................................... $28.00/day <br />EXPENDABLE SUPPLIES: <br />High Capacity (0.45 micron) Filter...................................................................... ...... $28.00/each <br />......................................... <br />Disposable Teflon Bailer .......... ................................................................................................. <br />...::.,................. $23.00/each <br />Disposable Polyethylene Bailer......................................................................................................................... <br />$17.00/each <br />Isopropyl Alcohol (decontamination).......................................................: <br />....................................................... .. $17.00/gallon <br />Deionized Water (decontamination)................................................................................................................. <br />$6.00/gallon <br />16 oz. Soil Jars (soil headspace analysis)............................................................................................................ $17.001box <br />TygonTubing ..................................... ......................................:............................................................. <br />$4.00/foot <br />PolyethyleneTubing.............................................................................................................................. ..............$1.00/foot <br />55 -gallon Drum............................................................................................................................................-...$85.00/drum <br />HEAVY EQUIPMENT: <br />Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc <br />.......................................................... Cost + 15% <br />ENVIRONMENTAL SITE ASSESSMENTS <br />Phase I Environmental Site Assessments <br />Tracts 50 acres or less (contiguous properties or per individual tract) ...............:.:..................................$2,100.00 <br />Minimum <br />Tracts between 51 and 500 acres (contiguous properties)............................................................:.......$2,500.00 <br />Minimum <br />Tracts greater than 500 acres...............................................................................................:..................... <br />varies by project <br />Phase II Environmental Site Assessments varies by project <br />Analytical Laboratory testing for hazardous or petroleum contamination <br />(soil, sediment and groundwater) ................................................. ................. :........................... cost + 15% <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Pagfm <br />
The URL can be used to link to this page
Your browser does not support the video tag.