My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-044
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2024 12:41:32 PM
Creation date
3/7/2024 12:39:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2024
Control Number
2024-044
Agenda Item Number
8.L.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 2 to Work Order No. 14 for North County Spoonbill Marsh River Intake Station
Access WWTF 24” Force Main Replacement IRCDUS Proj. ID 21.23.503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M 1MASTELLER & MOLER, INC. <br />M 1 —CIVIL ENGINEERS — <br />EXHIBIT A <br />1655 27`h <br />Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />Masteller & Moler, Inc. is pleased to present the Indian River County Department of Utilities Services <br />(IRCDUS) with this Work Order which provides for performance of civil engineering and related <br />subconsultant services associated with the design and permitting for the following proposed work: <br />Phase 1: Installation of a replacement Electric Services for the Spoonbill Marsh <br />Demineralized Concentrate Treatment Facility Raw Water Pumping Station; and <br />Phase 2: Upgrade the existing unpaved access maintenance roadway leading to the Raw <br />Water Pumping Station. <br />Project Description: <br />The Project will involve two (2) phases of Design, Permitting & Construction. Phase 1 will include <br />the construction of a new electrical power system to the existing Spoonbill Marsh Intake Pumping <br />Facility to replace the wiring, which has been determined to be in failure mode. Phase 2 will involve <br />upgrading the existing maintenance roadway leading to the intake pumping facility to a higher <br />elevation. <br />The work is proposed to be completed on lands owned by Grand Harbor North Lands LLC (GHNL). It <br />shall be the County's responsibility to obtain, if required, authorization from GHNL for performance <br />of the work. It is acknowledged the Consultant has a contractual relationship with GHNL as related <br />to the ongoing Spoonbill Preserve residential development project. Consultant's services do not <br />include any negotiations with GHNL on behalf of the County as related to this work authorization. <br />Specifically, Masteller & Moler, Inc. and its subconsultants propose to perform the following scope <br />of services: <br />Scope of Work: <br />Phase 1: New Electric Power Service <br />Task 1A — Civil Engineering Design & Preparation of Construction Plans: <br />Consultant shall design and prepare Civil Construction Plans for the installation of a new electric <br />power system to the Spoonbill Marsh Intake Pumping Facility from the existing transformer to <br />the Intake Pumping Facility's control panel. <br />As a result of previous work completed on this project, it has been determined the route of the <br />new direct buried power system shall generally follow the southern edge of the existing unpaved <br />maintenance road. <br />The Construction Plans will also depict the expected temporary impacts of wetlands that will <br />occur as a result of the proposed new electric power installation. <br />Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.