Laserfiche WebLink
M J MASTELLER & MOLER, INC. <br />M, — CIVIL ENGINEERS <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />needed basis such that we can certify the construction of the completed civil work. Formal <br />inspections require forty-eight (48) hours' notice prior to procedure. <br />Full-time resident construction observation is not required and therefore not included. <br />Our proposal for performance of these services is not based on meeting Indian River County <br />Utilities Permit Conditions which generally states: <br />"The Engineer -of -Record (EOR) shall have an on-site representative (inspector) whom <br />shall witness and document all materials used, installation procedures, problems <br />encountered and all tests specified by the Operation Permit Checklist. Daily construction <br />reports shall be submitted not less than monthly to IRCDUS. The daily reports shall be <br />signed and sealed by the EOR. The daily construction reports shall be submitted to IRCDUS <br />no later than seven days after completion of that portion of the construction requiring <br />clearance. Indian River County has unconditional rights to inspect the construction and <br />materials at any time." <br />As -Built Review: Upon completion of construction, Masteller & Moler, Inc. must be provided <br />with As -Built surveys to confirm proper horizontal and vertical alignment of constructed <br />electrical systems. The As -Built survey is typically provided by the Contractor's Surveyor <br />(licensed in the State of Florida) and must be provided in AutoCAD format, black line, and mylar <br />with reference to State Plane Coordinates as required by Indian River County. <br />While reviewing the as -built survey, we shall conduct an initial walk-through and develop a <br />punchlist of construction deficiencies. The punchlist shall be provided to the Contractor and the <br />client. Once the contractor has satisfactorily corrected the punchlist items and we are confident <br />that the site has been constructed in compliance with the permit approvals, and we are provided <br />with all required information, we shall submit a Certification of Construction Completion to <br />Indian River County and request final inspection. In the event the County prepares a punchlist, <br />we will provide said punchlist to the Contractor in order that the items may be addressed. Once <br />the County's punchlist has been resolved to our satisfaction, we shall notify the County that the <br />site is ready for re -inspection. <br />This task shall also include our inspector's attendance of progress meetings and assistance <br />during the Construction Completion process. Required certifications shall be prepared and <br />submitted as described herein. <br />Pay Request Review: We shall also review contractor's partial payment requests and provide a <br />certification each partial payment / final payment request accurately reflects completed work. <br />The As -built survey is not included in our fees. Daily and Periodic inspections of erosion control <br />devices and reports required by the NPDES General Permit are the Responsibility of the <br />Contractor and are not included in this proposal. <br />Page 5 of 11 <br />