My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-046
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:28:22 AM
Creation date
3/8/2024 10:26:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2024
Control Number
2024-046
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment 2 to Work Order 1 for Phase 2 Segment 3 Expression, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTH TECH <br />DRILLING <br />Environmental / Geotechnical <br />954-974-2424 <br />2703 NW 19th Street, Pompano Beach, FL 33069 <br />Monitoring Wells Sparge Wells Direct Push <br />Geotechnical Drilling SONIC Drilling <br />DATE 1/3/2024 <br />CLIENT: Geosyntec <br />Joshua Udvardy PHONE (561) 922-1102 <br />SITE: Indian River County Landfill - 1325 74th Ave SW - Vero Beach, FL <br />PROPOSED SCOPE OF WORK: Client to provide access to water source <br />(Hand clear ALL locations to 5' or Refusal) <br />(4) MW 2" x 20' w/ 10' .010" Screen (20/30 Sand) - 4" AGP Completion w/ 4 Bollards - 1/2 Hr Well Development <br />(4) MW 2" x 40'w/ 5' .010" Screen (20/30 Sand) - 4" AGP Completion w/ 4 Bollards - 1/2 Hr Well Development <br />(1) PZ 2" x -15'w/ 10'.01 - 0" Screen (20/30 Sand) - 4" AGP <br />Completion w/ 4 Bollards - 1/2 Hr Well Development <br />Drum Soil - Discharge Wter onsite <br />Soil Cores on Intermediate Wells and PZ. <br />SONIC DRILL <br />unit <br />Unit <br />Rate <br />Number <br />of Units <br />Extended Price <br />Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) <br />Sonic Daily Rate <br />8" Sonic Sonic Casing <br />Compact Track Loader / Water Support <br />Unless otherwise stated in this quote. <br />per day $3,900.00 3 <br />$11,700.00 <br />$0.00 <br />perfoot $25.00 0 <br />$0.00 <br />$0.00 <br />per day $575.00 3 <br />$1,725.00 <br />WELL MATERIALS <br />1" PVC Well Material (includes all annular backfill) <br />per foot <br />$0.00 <br />2" PVC Well Material (includes all annular backfill) <br />perfoot $16.00 255 <br />$4,080.00 <br />4" PVC Well Material (includes all annular backfill) <br />perfoot <br />$0.00 <br />Bentonite Pellets (Estimated 6 buckets per location) <br />bucket <br />$0.00 <br />$0.00 <br />Well Completion (includes 30 min. development, bolt -down manhole, concrete pad(2'x2' or 10" circle) & lockable well cap <br />8" Bolt -down completion <br />12" Bolt -down completion <br />PVC Stickup Completion w Development <br />4" Above Grade Protector Aluminum <br />Bollard <br />per well <br />per well <br />per well <br />per well $310.00 9 <br />each $125.00 36 <br />$0.00 <br />$0.00 <br />$0.00 <br />$2,790.00 <br />$4,500.00 <br />MISCELLANEOUS <br />Mobilization (Sonic Drill with all associated equipment) <br />roundtrip $1,500.00 1 <br />$1,500.00 <br />Daily Mobilization (to and from site per day) <br />per day <br />$0.00 <br />Per Diem <br />per night $575.00 2 <br />each $110.00 2 <br />$1,150.00 <br />$220.00 <br />Permits <br />Borehole Abandonment <br />i <br />per foot $12.00 0 <br />$0.00 <br />Water Meter and usage <br />lump sum $1,200.00 0 <br />$0.00 <br />DOT Approved 55 -gal Drum (As Needed) <br />each $80.00 6 <br />$480.00 <br />$0.00 <br />Additional Well Development <br />Onsite Pre -Drill Meeting <br />Standby / Difficult Moving Time <br />I 1/2 hour $85.00 0 <br />each <br />per hour $550.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Days to Complete Scone of Work I Submitted Bv: <br />ChcLrLekBttchew TnTA1 nunTF PRICT <br /><?R las nn <br />
The URL can be used to link to this page
Your browser does not support the video tag.