My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-046
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:28:22 AM
Creation date
3/8/2024 10:26:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2024
Control Number
2024-046
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment 2 to Work Order 1 for Phase 2 Segment 3 Expression, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br />BUDGET ESTIMATE <br />PHASE 2 - LINER INSTALLATION FOR CELL 3 CONSTRUCTION <br />CLASS I LANDFILL - SEGMENT 3 EXPANSION <br />INDIAN RIVER COUNTY, FLORIDA <br />PHASE 4: CONSTRUCTION MANAGEMENT <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />COST <br />A. <br />Professional Services <br />a. <br />Senior Principal <br />Hr <br />$294.00 <br />60 <br />$17,640.00 <br />b. <br />Principal <br />Hr <br />$274.00 <br />0 <br />$0.00 <br />c. <br />Senior Professional <br />Hr <br />$254.00 <br />0 <br />$0.00 <br />d. <br />Project Professional <br />Hr <br />$224.00 <br />0 <br />$0.00 <br />e. <br />Professional <br />Hr <br />$198.00 <br />30 <br />$5,940.00 <br />f. <br />Senior Staff Professional <br />Hr <br />$178.00 <br />30 <br />$5,340.00 <br />g. <br />Staff Professional <br />Hr <br />$154.00 <br />0 <br />$0.00 <br />Subtotal Professional Services <br />$28,920.00 <br />B. <br />Technical/Administrative Services <br />a. <br />Site Manager/Construction Manager <br />Hr <br />$142.00 <br />144 <br />$20,448.00 <br />b. <br />Senior Engineering Technician <br />Hr <br />$99.00 <br />0 <br />$0.00 <br />c. <br />Engineering Technician <br />Hr <br />$83.00 <br />0 <br />$0.00 <br />d. <br />Senior Designer <br />Hr <br />$190.00 <br />40 <br />$7,600.00 <br />e. <br />Designer <br />Hr <br />$160.00 <br />0 <br />$0.00 <br />f. <br />Senior Drafter/Senior CADD Operator <br />Hr <br />$145.00 <br />0 <br />$0.00 <br />g. <br />Project Administrator <br />Hr <br />$85.00 <br />8 <br />$680.00 <br />h. <br />Clerical <br />Hr <br />$65.00 <br />24 <br />$1,560.00 <br />Subtotal Technical/Administrative Services <br />$30,288.00 <br />C. <br />Indirect Expenses <br />a. <br />Subcontractor Services <br />Each <br />$0.00 1 <br />1.12 <br />$0.00 <br />Subcontractor Services <br />$0.00 <br />D. <br />Direct Expenses <br />a. <br />Lodging <br />Da <br />$150.00 <br />0 <br />$0.00 <br />b. <br />Per Diem <br />Da <br />$55.00 <br />0 <br />$0.00 <br />c. <br />Communications Fee <br />3% Labor <br />$0.03 <br />$59,208 <br />$1,776.24 <br />d. <br />CADD Computer System <br />Hr <br />$15.00 <br />40 <br />$600.00 <br />e. <br />Vehicle Rental & Fuel <br />Da <br />$150.00 <br />30 <br />$4,500.00 <br />f. <br />8"x11" Photocopies <br />Each <br />$0.09 <br />200 <br />$18.00 <br />g. <br />CADD Drawings <br />Each <br />$3.00 <br />50 <br />$150.00 <br />Subtotal Reimbursables <br />$7,044.24 <br />TOTAL ESTIMATED BUDGET: PHASE 4 <br />$66,252.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.