Laserfiche WebLink
Table 8 <br />BUDGET ESTIMATE <br />PHASE 2 - LINER INSTALLATION FOR CELL 3 CONSTRUCTION <br />CLASS I LANDFILL - SEGMENT 3 EXPANSION <br />INDIAN RIVER COUNTY, FLORIDA <br />PHASE 8: MISCELLANEOUS ENGINEERING SUPPORT SERVICES <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />COST <br />A. <br />Professional Services <br />a. Senior Principal <br />Hr <br />$294.00 <br />16 <br />$4,704.00 <br />b. Principal <br />Hr <br />$274.00 <br />0 <br />$0.00 <br />c. Senior Professional <br />Hr <br />$254.00 <br />0 <br />$0.00 <br />d. Project Professional <br />Hr <br />$224.00 <br />0 <br />$0.00 <br />e. Professional <br />Hr <br />$198.00 <br />60 <br />$11,880.00 <br />f. Senior Staff Professional <br />Hr <br />$178.00 <br />30 <br />$5,340.00 <br />g. Staff Professional <br />Hr <br />$154.00 <br />0 <br />$0.00 <br />Subtotal Professional Services <br />$21,924.00 <br />B. <br />Technical/Administrative Services <br />a. Site Manager/Construction Manager Hr <br />$142.00 <br />0 <br />$0.00 <br />b. Senior Engineering Technician <br />Hr <br />$99.00 <br />0 <br />$0.00 <br />c. Engineering Technician <br />Hr <br />$83.00 <br />0 <br />$0.00 <br />d. Senior Designer <br />Hr <br />$190.00 <br />40 <br />$7,600.00 <br />e. Designer <br />Hr <br />$160.00 <br />20 <br />$3,200.00 <br />f. Senior Drafter/Senior CADD Operator <br />Hr <br />$145.00 <br />0 <br />$0.00 <br />g. Project Administrator <br />Hr <br />$85.00 <br />0 <br />$0.00 <br />h. Clerical <br />Hr <br />$65.00 <br />6 <br />$390.00 <br />Subtotal Technical/Administrative Services <br />$11,190.00 <br />C. <br />Indirect Expenses <br />a. Subcontractor Services <br />Each <br />$0.00 1 <br />1.12 <br />$0.00 <br />Subcontractor Services <br />$0.00 <br />D. <br />Direct Expenses <br />a. Lodging <br />Da <br />$150.00 <br />2 <br />$300.00 <br />b. Per Diem <br />Da <br />$55.00 <br />2 <br />$110.00 <br />c. Communications Fee <br />3% Labor <br />$0.03 <br />$33,114 <br />$993.42 <br />d. CADD Computer System <br />Hr <br />$15.00 <br />60 <br />$900.00 <br />e. Vehicle Rental & Fuel <br />Da <br />$150.00 <br />2 <br />$300.00 <br />f. 8"x11"Photocopies <br />Each <br />$0.09 <br />50 <br />$4.50 <br />g. CADD Drawings <br />Each <br />$3.00 <br />30 <br />$90.00 <br />Subtotal Reimbursables <br />$2,697.92 <br />TOTAL ESTIMATED BUDGET: PHASE 8 <br />$35 811.92 <br />