My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />M <br />WORK i11RECiIVE CHANGE <br />iNSTRUGT ONS <br />A. GENERAL INFORMATION <br />This document was developed for use in situations inirolving changes in the Work which, <br />if not processed expeditiously, might delay the Project. These changes are often initiated <br />in the field and may affect the Contract Price or the Contract Time. This is not a'Change <br />Order, but only a directive to proceed with 'Work that may be included in a subsequent <br />Change Order. <br />For supplemental instructions and minor changes not involving a change in the Contract <br />Puce or the Contract Time, a Field Order may be used. <br />B. COMPLETING THE WORK DIRECTIVE CHANGE FORM • <br />Engineer initiates the form, including a description of the items involved and attachments. <br />Based on conversations between Engineer and Contractor, Engineer completes the fol- <br />lowing. <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark <br />the method to be used in determining the final cost of Work involved and the net <br />effect on the Contract Price. If the change involves an increase in the Contract Price <br />and the estimated amount is approached before the additional or changed Work is <br />completed, another Work Directive Change must be issued to change the time or <br />Contractor may stop the changed Work when the estimated time is reached. If the <br />Work Directive Change is not likely to change the Contract Time, the space for <br />estimated increase (decrease) should be marked "Not Applicable". <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIME: Mark <br />the method to be used in determining the change in Contract Time and the estimated <br />increase or decrease in Contract Time. If the change involves an increase in the <br />Contract Time and the estimated time is approached before the additional or changed <br />Work is completed, another Work Directive Change must be issued to change the <br />time or Contractor may stop the changed Work when the estimated time is reached. <br />If the Work Directive Change is not likely to change the Contract Time, the space <br />for estimated increase (decrease) should be marked "Not Applicable". <br />I <br />Once Engineer has completed and signed the form, all copies should be sent to Owner for <br />authorization because Engineer alone does not have authority to authorize changes in <br />Price or Time. Once authorized by Owner, a copy should be sent by Engineer to Con- <br />x' <br />tractor. <br />Once the Work covered by this directive is completed or final cost and time determined, <br />Contractor should submit documentation for inclusion in a Change Order. <br />THIS I5 A DIRECI`IVE TO PROCEED WITH A CHANGE THAT MAY AFFECT <br />4 THE CONTRACT PRICE ORTHE CONTRACT TIME. A CHANGE ORDER, IF ANY, <br />SHOULD BE CONSIDERED PROMPTLY. <br />00600-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.