My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An <br />• <br />6706-050 <br />4. Shop Drawings and Samples: <br />a. Receive and record date of receipt of Shop Drawings and samples, <br />receive samples which are furnished at the site by CONTRACTOR, and <br />notify ENGINEER of their availability for examination. <br />b. Advise ENGINEER and CONTRACTOR or his superintendent Immediately <br />of the commencement of any Work requiring a Shop Drawing or sample <br />submission If the submission has not been approved by the ENGINEER. <br />5. Review of Work, Rejection of Defective Work, Inspections and Tests:. <br />a. Conduct on-site observations of the Work in progress to assist ENGINEER <br />In determining If the Work is proceeding in accordance with the Contract <br />Documents and that completed Work will conform to the Contract <br />Documents. <br />b. Report to ENGINEER whenever he believes that any Work is <br />unsatisfactory, faulty or defective or does not conform to the Contract <br />Documents, or does not meet the requirements of any inspections, tests <br />or approval required to be made or has been damaged prior to final <br />payment; and advise ENGINEER when he believes Work should be <br />corrected or rejected or should be uncovered for observation, or requires <br />special testing, inspection or approval. i <br />c. Verify that tests, equipment and systems startups and operating and <br />maintenance instructions are conducted as required by the Contract <br />Documents and in presence of the required personnel, and that <br />CONTRACTOR maintains adequate recr)rds thereof, observe, record and <br />report to ENGINEER appropriate details relative to the test procedures and <br />startups. <br />d. Accompany visiting inspectors representing public or other agencies <br />having jurisdiction over the Project, record the outcome of these <br />inspections and report to ENGINEER. <br />6. Interpretation of Contract Documents: Transmit to CONTRACTOR <br />engineer's clarifications and interpretations of the Contract. Documents. <br />7. Modifications: Consider and evaluate CONTRACTOR'S suggestions for <br />modifications in Drawings or Specifications and report them with <br />recommendations to ENGINEER. <br />00800-4401 " <br />Ili5,�96 <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.