Laserfiche WebLink
9 <br />01025-1 <br />(UGC01025.FMT)zaa <br />S CTION 01025 <br />MEASUP,EMENT AND PAYMENT <br />PART 1 - <br />GENERAL <br />1.01 <br />GENERAL <br />Measurement and payment will be based upon <br />work completed <br />and accepted in accordance with the Contract Documents.. <br />No separate payment will be made <br />for excavation, <br />trenching, dewatering, backfilling, <br />leakage tests, <br />surveying, density tests, or other incidental items of <br />work not shown in the Agreement. <br />1.02 <br />EQUIPMENT AND MATERIALS IN STORAGE <br />Partial payment. for materials and equipment <br />in proper <br />storage at the site of the work or other <br />approved storage <br />site will be made for those items <br />for which the <br />Contractor has submitted paid invoices <br />to the Engineer. <br />The partial payment for stared materials will be 50% of <br />the value of materials and equipment, based <br />on receipted <br />bills, furnished but not incorporated <br />in the work, s <br />determined by Engineer. <br />1.03 <br />MEASUREMENT <br />A. Mobilizations Measurement shall <br />be on a lump sum <br />basis, and shall be limited to the following <br />maximum amounts: <br />ORIGINAL CONTRACT AMOUNT MAXIMUM AMOUR <br />FROM <br />_ <br />MORE THAN TO AND -INCLUDING ,ITEM <br />FOR MOBILIZATION <br />0 100,000 <br />3,000 <br />100,000 500,000 <br />15,000 <br />500,000 1,000,000 <br />30,000 <br />1,000;000 2,000,000 <br />60,000 <br />2,000,000 3,000,000 <br />90 a 0'i+0 <br />3,000,000 4,000,000 <br />120,000 <br />4,000,000 5,000,000 <br />125,000 <br />5,000,000 6,000,000 <br />150,000 <br />6,000,000 7,000,000 <br />175,000 <br />7,000,000 10,000,000 <br />200,000 <br />10, 000, 000 ----•------- <br />250,000 <br />9 <br />01025-1 <br />