0 <br />40 <br />sh <br />f' <br />At completion of the change, Engineer will <br />determine the cost of such work based on the <br />unit prices and quantities used, <br />a. Contractor shall submit documentation to <br />f establish the number of units of each <br />item and any claims for a change in <br />r contract: Time. <br />3. Engineer will sign and date a second Change <br />order to establish the change in contract Sum <br />and in Contract Time. <br />4, owner and contractor will sign and date the <br />to indicate their <br />second Change Order <br />agreement with the terms therein. <br />1.1Q TIME AND MATERIAL/ FORCE ACCOUNT CHANGE ORDER/ CONSTRUCTION <br />CHANGE AUTHORIZATION <br />A. Engineer and owner will issue a Work Directive <br />Change directing Contractor to Proceed with the <br />changes on a time-and--material/force account basis. <br />B. At completion of the change, Contractor <br />shalta l <br />submit itemized accounting and supporting <br />provided in the Article "Documentation of Proposals <br />and Claims" of this section. <br />C. Engineer will determine the allowable cost of such <br />work, as provided in General Conditions and <br />Supplementary Conditions. <br />D. Engineer will sign and date the Change order to <br />establish the change in Contract sum and in <br />Contract Time. <br />E. Owner and contractor will sign and date the Change <br />order to indicate their agreement therein. <br />1,11 CORRELATION WITH CONTRACTOR'S SUBMITTALS <br />A. Contractor shall periodically revise Schedule of <br />Values and Request for Payment forms to record each <br />change as a separate item of Work, and to record <br />the adjusted Contract Sum. <br />B. Contractor shall periodically revise the <br />Construction Schedule to reflect each change in <br />Contract Time. <br />dules to <br />es <br />1. Revise <br />ofuworkso <br />t3ffected bythehchanges. other <br />01151-5 <br />L <br />I <br />