My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(UGC01201. E' T) : as <br />SECTION 01201 <br />r PRECONSTRUCTION CONFERENCE <br />PART 1 GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Engineer shall schedule and administer the <br />preconstruction conference and shall perform the <br />following duties: <br />1. Prepare agenda for meeting. <br />2. Give notice of meeting three days in advance <br />of meeting date. <br />3. Make physical arrangements for meeting. <br />4. Preside at meeting. <br />5. Record the minutes which shall include all <br />significant proceedings and decisions. <br />6. Reproduce and distribute copies of minutes <br />within fifteen (15) working days after <br />meeting. Minutes shall be distributed to all <br />participants in the meeting and to all. parties <br />affected by decisions made at the meeting. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01(700: Description of Work. <br />D. Section 01311; Construction Schedule. <br />C. Section 01340: Shop Drawings, Product Data and <br />Samples. <br />D. Section 01'770: Project Record Documents. <br />F. Section 01730: Operating and Maintenance Data. <br />1.03 PRECONS`CRUCTLON CONFERENCE <br />A. Engineer will schedule meeting with Contractor, <br />Owner and other affected parties. <br />B. Location of the preconstruction meeting: <br />the <br />project site or a nearby office to be selected b <br />Owner/Engineer. <br />01201-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.