Laserfiche WebLink
C> <br />46 <br />• <br />40 <br />o <br />4. Bidder will complete and include with the bid the Schedule of Bid Items attached to this <br />Proposal. The quantities shown on the Schedule of Bid Ttems are approximate quantities <br />to be used for the purpose of comparing bids. The actual quantities may vary. It is <br />further understood that the actual amount of the Agreement, and payments thereunder, <br />will be based upon the actual quantities placed into the work. <br />5. Bidder agrees that the work will be completed in accordance with the following time <br />frame: <br />(a) Within -4 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materiais to the job site. <br />T Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 35 calendar days to 70 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their preconstruction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a and b) constitute Substantial <br />Completion. <br />(c) From 7 i calendar days to 9D calendar days from the effective date of <br />Notice to Proceed, the CONTRACTOR shall complete the fallowing tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />t_ <br />r`. <br />00310-3 <br />Diu Foram <br />�„[ �SercmirhlnFnsnn Pn jecuPralerl•R.kridjc Scwrr 10 bid Wnnda <br />