My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />dB <br />40 <br />r <br />(UGC01381.FMT):aa <br />SECTION 01381 4 <br />r <br />AUDIO-VISUAL DOCUMENTATION <br />PART 1 - GENERAL <br />1.01 DESCRIPTION OF WORK <br />Prior to commencing the Work, the Contractor shall have <br />a continuous color audio -video tape recording taken <br />along the entire length of the Project to serve as a <br />record of preconstruction conditions. The <br />preconstruction Swale elevations shall be recorded at <br />100' intervals. <br />1.02 APPROVAL <br />No construction shall begin prior to review and <br />acceptance of the tapes covering the construction area <br />by the Owner or Engineer. The Engineer shall have the <br />authority to reject all or any portion of a videotape <br />not conforming to specifications and order that it be <br />redone at no additional charge. The Contractor shall <br />reschedule unacceptable coverage within five (5) days <br />after being notified. The Engineer shall designate <br />those areas, if any, to be omitted from or added to the <br />audio -video coverage. Tape recordings shall not be <br />made more than thirty (30) days prior to Beginning of <br />construction in any area. All tapes and written <br />records shall become property of Owner. The tapes <br />shall be delivered to the Owner as soon as possible <br />after recording. <br />QUALITY ASSURANCE <br />The Contractor ,hall engage the services of a <br />professional electrographer. The color audio -video <br />tapes shall be prepared by a responsible commercial <br />firm known to be skilled and regularly engaged in the <br />business of preconstruction color audio -video tape <br />documentation. <br />01381-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.