Laserfiche WebLink
40 <br />i <br />4b <br />f <br />i C. Contractor is responsible for arranging power for <br />his office trailer(s), power tools etc., at his <br />r own expense. The Contractor shall 4y the costs of <br />all power used. <br />D. Provide POWER CENTERS for miscellaneous tools and <br />equipment used in -the work: y <br />1. Weatherproof distribution box with minimum of <br />four 20 amp., 120 volt grounded outlets <br />2. ]Locate so that power is available at any point <br />of use with minimum 100 -foot CONSTRUCTION -TYPE <br />power cords <br />3. Provide circuit breaker protection for each <br />outlet <br />E. Provide adequate artificial lighting for all areas <br />of work, when natural light is not adequate for <br />work, and for areas accessible to persons other <br />than Contractor's employees. <br />F. If Contractor requires service other than specified <br />above, he shall arrange for, provide maintenance, <br />and pay all costs incurred. <br />2.03 TEMPORARY WATER <br />Contractor shall make arrangements with owner for all <br />temporary water at the project site. Contractor shall <br />pay for all temporary water required for his operations. <br />2.04 TEMPORARY SANITARY FACILITIES <br />A. Contractor shall provide temporary sanitary <br />facilities in compliance with laws and regulations. <br />B. Contractor shall provide for regular service, <br />cleaning, and maintenance of temporary facilities <br />and enclosures. <br />PART 3 -- EXECUTION <br />i <br />3.01 GENERAL <br />A. Comply with applicable requirements specified in <br />Section 02670 - Submersible Wastewater Pumping <br />Station, as well as state and local codes. <br />e- <br />B. Maintain and operate systems to ensure continuous <br />service. <br />I <br />L_ 01510-2 <br />