Laserfiche WebLink
C-1 <br />i <br />40 <br />r <br />2. Contractor shall take immediate steps to <br />l remedy the stated deficiencies, and send a <br />i second written certification to Engineer that <br />the work is complete <br />3. Engineer will reinspect the work <br />r ' D. When Engineer finds that the work is acceptable <br />under the Contract Documents, he shall request the <br />Contractor to make closeout submittals. <br />C <br />1.04 REINSPECTION FEES <br />Should the Engineer perform reinspection due to failure <br />of the work to comply with the claims of status of <br />completion made by the Contractor, Contractor will <br />compensate Engineer/owner for such additional services. <br />1.05 ADDITIONAL SERVICES <br />Should Engineer be required to provide representation at <br />the site for the administration of the Contract for <br />construction, more than thirty days after the specified <br />Date of Substantial completion of the work, Contractor <br />will compensate Engineer for such additional services. <br />1.06 CONTRACT'OR'S CLOSEOUT SUBMITTALS TO ENGINEER <br />A. Evidence of compliance with requirements of <br />governing authorities: Certificate of Occupancy <br />B. Project Record Documents: To requirements of <br />Section 01720 <br />C. Operating and Maintenance Data: Instructions to <br />Owner's personnel conforming to requirements of <br />Section 01730 <br />` D. Warranties and Bonds: To requirements of section <br />F <br />01740; also, see Item H below <br />E. Spare Parts and Maintenance Materials: To <br />requirements of each specification section <br />F. Evidence of Payment and Release of Limns: To <br />requirements of General and slapplumentary <br />conditions <br />G. certificate of Insurance for Products and Completed <br />p Operations <br />L <br />01700-3 <br />