Laserfiche WebLink
CA <br />7.5 CONTRACTOR has correlated the results of all such <br />observations, examinations, investigations, <br />explorations, tests, reports and studies with the terms <br />and conditions of the Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts, errors or discrepancies that he has <br />discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to <br />CONTRACTOR.. <br />Article 8. CONTRACT DOCUMENTS, <br />The Contract Documents which comprise the entire agreement between <br />OWNER and CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Performance and other bonds (Sections 00610 and 00620). <br />8.3 Notice of Award and Notice to Proceed. <br />8.4 General Conditions (Section 00700). <br />8.5 Supplementary Conditions (Section 00800). <br />8.6 Specifications bearing the title "ROCKRIDGE <br />SEWER PROJECT" as listed in the table of <br />contents hereof. <br />8.7 Drawings, inclusive with each sheet bearing <br />the following general title: <br />"ROCKRIDGE SEWER PROJECT" <br />8.8 Addenda numbers _ to _, inclusive. <br />8.9 CONTRACTOR's Hid (Section 0031.0). <br />8.16 Indian River County Water and Wastewater <br />Utility Standards. <br />8.11 The following, which may be delivered or issued after <br />the effective date of the Agreement and are not attached <br />hereto: All written amendments and other documents <br />amending, modifying, or supplementing the Contract <br />Documents pursuant to Paragraphs 3.4 and 3.5 of the <br />General Conditions. <br />FA -6 <br />