Laserfiche WebLink
4.3 Information and data reflected in the Contract Documents with respect to <br />underground facilities at or contiguous to the site is based upon <br />information and data furnished to Owner and Engineer by owners of such <br />underground facilities or others, and Owner does not assume responsibility <br />for the accuracy or completeness thereof unless it is expressly provided <br />otherwise in the Supplementary Conditions. <br />4.4 Provisions concerning responsibilities for the adequacy of data furnished <br />to prospective Bidders on subsurface conditions, underground facilities <br />and other physical conditions, and possible changes in the Contract <br />Documents due to differing conditions appear in Paragraphs 4.2 and 4.3 of <br />the General Conditions. <br />4.5 Before submitting a Bid, each Bidder will, at Bidder's own expense, make <br />or obtain any additional examinations, investigations, explorations, tests, <br />and studies, and obtain any additional information and data which pertain <br />to the physical conditions (surface, subsurface and underground facilities) <br />at or contiguous to the site or otherwise which may affect cost, progress, <br />performance, or furnishing of the work and which Bidder deems necessary <br />to determine its Bid for performing and furnishing the work in accordance <br />with the time, price and other terns and conditions of the Contract <br />Documents. <br />4.6 On request in advance, Owner will provide each Bidder access to the site <br />to conduct such explorations and tests as each Bidder deems necessary for <br />submission of a Bid. Bidder shall fill all holes, clean up, and restore the <br />site to its former condition upon completion of such explorations. <br />4.7 The lands upon which the work is to be performed, right-of-way and <br />easements for access thereto and other lands designed for use by the <br />Contractor in performing the work are identified in the Contract <br />Documents. All additional lands and access thereto required for <br />temporary construction facilities or storage of materials and equipment are <br />to be provided by and paid for by the Contractor. Easements for <br />permanent structures or permanent changes in existing structures are to be <br />obtained and paid for by the Owner unless otherwise provided in the <br />Contract Documents. <br />4.8 The submission of a Bid will constitute an incontrovertible representation <br />by Bidder that Bidder has complied with every requirement of this Article <br />4, that without exception the Bid is premised upon perfor ring and <br />furnishing the work required by the Contract Documents and such means, <br />methods, techniques, sequences or procedures of construction as may be <br />indicated in or required by the Contract Documents, and that the Contract <br />00100-3 <br />Instructions to 9iddcn <br />°' C.'JFRMIWQbnwn ProjHu'P ujty - Rocknds, Sewer lnm rmenn' W IAg Jne <br />