My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/20/1996
CBCC
>
Meetings
>
1990's
>
1996
>
8/20/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 9:18:02 AM
Creation date
6/17/2015 9:55:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/20/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOPICS: PEP REEF INSTALLATION UPDATE - AUGUST 20, 1996- <br />u Fabrication & Transportation of Reef Units <br />g Installation/Deployment <br />g Permitting Conditions <br />g Public Safety Issues <br />g Monitoring Plan & Data Analysis <br />FABRICATION <br />g Fabrication started May 17, 1996 <br />g Minor repairs to units <br />g Strength testing 28 -day compression 5000 psi <br />g Total 215 units fabricated as of August 9, 1996 <br />TRANSPORT <br />Trucked to Ft. Pierce staging area <br />• Loaded and barged to site <br />INSTALLATION DEVELOPMENT <br />'a Notice to proceed issued June 28, 1996 <br />g North (Village Spires) to South (Huminston Park) <br />' 1st unit deployed on July 20, 1996 <br />g Installation completed August 16, 1996 <br />g As -built data recorded <br />g Minor Deviations <br />Bottom topography <br />Hard bottom - submerged rock <br />PERMIT CONDITIONS <br />g Pre -installation survey completed June 12, 1996 <br />g Copy of permit at work site <br />g Reef units placed on sand bottom <br />• Alignment and location comply with approved plan and <br />specs <br />g Monthly progress reports submitted <br />PUBLIC SAFETY ISSUES <br />g Signs located along beach public access and resorts <br />g Public notices in Press Journal <br />g Buoys attached to reef <br />`a Lifeguards patrol beach area <br />g Display unit at Humiston Park <br />MONITORING PLAN <br />g Begin following installation <br />Topographic & bathymetric surveys <br />Wave force measurements <br />Volumetric changes and accumulations <br />Shoreline changes <br />Scour measurements <br />56 <br />AUGUST 20, 1996 <br />BOOK <br />98 F,:_E 875 <br />
The URL can be used to link to this page
Your browser does not support the video tag.