Laserfiche WebLink
I -J <br />40 <br />40 <br />40 <br />Exhibit A <br />Barber Street Improvements <br />A $200,000 Transportation Impact Fee allocation will be used for enhancements <br />on Barber Street to include: <br />a) Barber Street at Schumann Drive Intersection Improvements. In order to <br />improve the intersection capacity, turn lanes are required on all <br />approaches and a traffic signal is required. <br />b] Capacity improvements to the Barber Street Bridge over the Elkcam <br />Canal; to also incorporate a center turn lane, 8' shoulders and <br />bikelanelsidewalk. The City of Sebastian will be responsible for design <br />and bids prior to construction.. <br />