My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-045
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 3:03:15 PM
Creation date
3/14/2024 2:58:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2024
Control Number
2024-045
Agenda Item Number
8.M.
Entity Name
CMM Roofing, Inc.
Subject
Agreement for Station 11 Roof Replacement;
Bid Number
2024017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid <br />Item <br />No. <br />Item of Work <br />Unit of <br />Measure <br />Unit Price <br />GVGYVAI <br />Quantity <br />.1i0t1u11 L, nuut nepiacement <br />Bid Item Total <br />5 <br />ROOFING PERMIT <br />Each <br />$225.00 <br />1 <br />$225 <br />6 <br />Additional Roof Permit Fee of 0.4334% of <br />contract/work order valuation over $51,916 (see <br />Appendix A) <br />Each <br />$ <br />1 <br />- - <br />Subtotal <br />(Base Bid): <br />$ S 33 y S <br />Manufacturer's roof warranty attached yes/no <br />10% Contingency Allowance (10% of Base Bid): <br />$ _ZG .5-33 , S16 <br />.` '''OFiP•'••. <br />� <br />Total Base Bid with Contingency (Base Bid + Contingency): <br />O <br />Total Base Bid Amount in Words: <br />Supplemental (as needed) Bid Prices <br />Sup -1 <br />Replace plywood sheathing, as necessary <br />SF $ <br />$ UO <br />Sup -2 <br />Additional plywood decking replacement <br />SF $ �e OU 1 <br />$ <br />Sup -3 <br />Additional work outside scope <br />Man Hour $ ys OU 1 <br />$ <br />' <br />Sup -4 <br />Additional materials outside scope <br />% markup as- % N/A <br />N/A <br />Sup -S <br />I Additional cost for special color, if requested <br />LS $ AJ Z.4 LS <br />$ — <br />Roof and Warrantv Details <br />Proposed Roof Manufacturer <br />:LIZ4 <br />e" 1 M p 40.15 � <br />Colors available at base bid price (line 2) <br />Sao <br />� 1 �y r,Q _ <br />s) du <br />Brochure attached Yes/No <br />t/ <br />Roof warranty period <br />Roof workmanship warranty period <br />Manufacturer's roof warranty attached yes/no <br />Y�5 <br />1 <br />.` '''OFiP•'••. <br />� <br />rs &k <br />f i'ru C;7 <br />Time to apply for permit after "notice to proceed" 0 Days <br />Project completion time after receipt of permit: KJ DAYS <br />Page 16 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.