Laserfiche WebLink
10 <br />Description: <br />Delays incurred as a result of hurricane Floyd. <br />Purpose: <br />Securing site in event of hurricane and time associated with <br />evacuation of barrier island. <br />Cost: <br />$0.00 <br />Time: <br />5 days (SC) <br />11 <br />[Description: <br />RTU modifications <br />Purpose: <br />To monitor pump stations at water treatment facilities. <br />Cost: <br />$11,269.00 <br />Time: <br />4 days (SC) <br />12 <br />Description: <br />Electrical modifications in sodium hypochloride generation room. <br />Purpose: <br />Room layout modifications resulted in additional electrical <br />conduit/wiring. <br />Cost: <br />$1,615.00 <br />Time: <br />2 days (5C) <br />13 <br />Description: <br />Damage as a result of hurricane Irene. <br />Purpose: <br />Repair damaged 10 -inch bypass line, <br />Cost. <br />$2,078.00 <br />Time: <br />0 days <br />14 <br />Description: <br />Delays associated with startup and training. <br />Purpose: <br />To facilitate startup and training of County staff after <br />Thanksgiving holiday. <br />Cost: <br />$0.00 <br />Time: <br />5 days (SC) <br />0922 <br />