Laserfiche WebLink
• <br />40 <br />40 <br />40 <br />I� <br />20 Description: Credit for monorail repair allowance. <br />21 <br />04 <br />xR92.2 <br />Purpose: Credit for monies not used. <br />Cost: <br />($170.00) <br />Time: <br />0 days <br />Description: <br />Credit for building permit allowance. <br />Purpose: <br />Credit for monies not used. <br />Cost: <br />($1.,450.00) <br />Time: <br />0 days <br />Description: <br />Floor coating of pump area, offices, storage and generator rooms. <br />Purpose: <br />Floor coating will reduce dust in facility and provide better <br />protection to existing concrete floor. <br />Costa <br />$11,936.00 <br />Time: <br />7 days (FC) <br />