My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-046A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-046A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 3:19:10 PM
Creation date
3/18/2024 3:17:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2024
Control Number
2024-046A
Agenda Item Number
15.B.3.
Entity Name
Comanco Environmental Corp.
Subject
Agreement for Class I Landfill Segment 3 Cell 3 Phase II;
Bid Number
2024027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM 4 <br />SOLID WASTE DISPOSAL DISTRICT <br />INDIAN RIVER COUNTY LANDFILL <br />PHASE 2 - CELL 3 - SEGMENT 3 EXPANSION (11.5 AC.) <br />BID FORM, REV. 2 <br />Item <br />No. <br />rap <br />Work Deur' ifon.1tern <br />units <br />Estirnatad <br />Quantity <br />More VD <br />Unit ceet(SI <br />Tical Cc it (S) <br />e7aledal <br />Labor <br />GJaeral site pirvar-aw <br />Mobilization and Demoblliubon (not-m+aceed 5%oftonl bid) (Nate 1) <br />LS <br />t1 <br />$2,546.001 <br />$272,454,00 $275,0 0.00 <br />2 <br />Surveying&Aa-BuiltDnwinp(NoteII) <br />I LS <br />1 1 <br />$0.001 <br />$72500,00 <br />$71500.001 <br />Subtotal Site Preparation = <br />1347 51 in nnl <br />FAWOWk pndkifes Gradit andleplyde CoVeafda ltasellQ <br />3 <br />General and SucctumI tell <br />Sae Gndtng and IAvelig of Top of Lina Subbase Prior to <br />A Geosynthetialnsh4Ltion(PrimarilyCuQ <br />`'� <br />'400 <br />$7.8 <br />$18.1 <br />$36,4 0.00 <br />Q11 Liner dysrem (Nora M <br />Subtotal 13arthwork =$36,4K.00 <br />4 <br />line Protective IAya <br />- <br />A 4•in. Liner Pntactive Layer whk Grading and Compaction <br />cr` <br />36.-1 <br />$22.06 <br />$23.94 <br />1 65 0.0 <br />B 1hueroell Sal a stoma Barna <br />I'M <br />C ITanporaryintercell Berm with Rein Rap <br />Cyd <br />1.7001 <br />$22.0623.94 <br />$78,40A <br />5 <br />PririaryGiacompositeDrairageLayer <br />sgft <br />499.5001$0.352 <br />o <br />Pronary60 nil Taaured lIDPE Ckonc=bmee <br />Sq ft <br />499,5007 <br />S-ridaryGeawmpmil-DreimgeLays <br />sgft <br />499,500S <br />Secondary 60 mil TWured HDPE Geornembrane <br />soft <br />499,5009 <br />M$O.278 <br />Geosyntheac Clay liner <br />aqft <br />499,3506 <br />Ju10 <br />Electrical Leak Location Survey <br />is <br />II <br />Una System Tia -in (Excitation WaldtDoublewack Fusion Weld) <br />LF <br />1,300 <br />12 <br />rJrabnambrana Reirdlap <br />t3 omembmneRah&P <br />I aq ft <br />1 1.7,1001 <br />$0.43510.445 <br />$32,6418.00 <br />usion WAdG--b-Saciricial Reia9aa p Primary HDPB <br />B F.xueom <br />Geomenlimne <br />LF <br />t,3o0 <br />0.6 <br />6.38 <br />91 D.00 <br />13 <br />lAnchorTranch <br />LF <br />2,900 <br />1 $0,5111 <br />1 <br />Jtucba/r Colledlax 6 Dated-Sysrarn <br />Subtotal Cell 3 Liner System -- <br />L4 <br />LCS Comdor <br />A_ 0ntu4rbniugaMN ial(AAMMNo.57) <br />cyd <br />i.Wo <br />$188.94 <br />$129.06 $318 .00 <br />B. lGeotatil. FiltedCushion with ". overlap and sawn at stain <br />zq yd <br />900 <br />15 <br />LDS Additional Geonei Drainage [Ayer in Corridor <br />tq yd <br />1,920 <br />$5.76 <br />5.24 <br />$213M.00 <br />16 <br />LIDS Granular Drainage Materiel (AASHTO No. 4) <br />ryd <br />w <br />S09-74 <br />Al 17-2 <br />V-6 KOM <br />IT <br />Carrier Pipe 4te Cclledioo +Lewliate <br />104n Dist. SDR. 17 Solid HDPE Cart.esdra <br />Dicticn Drill])510 <br />Detection+Lacuna Gravity U.. iiorizcnWm <br />Ly <br />3 <br />.43 <br />IS <br />1141 Dia 5DR 21 Sold 1�PE. Co matait Pipe(LAacaaw Coliaticn+ <br />L.adwee Detection +Ladiatc(Iravity Line+ HorizmrW Direction Drill) <br />LF <br />510 <br />19 <br />1104n. Dia. SDR 17 LDS Padomted Pipe A Fittings <br />LF <br />350 <br />20 <br />10 -in. Di. SDR 17 LCS Perforated Pipe & Fittings <br />LF <br />1,300 <br />510-59 <br />S32 --S Op <br />21 <br />Toa Drain (Note VII) <br />A 6 -in Dia. SDR 17 Perfomad HDPE Pipe <br />LF <br />1,250 <br />B Toe Drain Connector and Reducer <br />each <br />2 <br />1616.72 <br />1583.261 <br />1140�- <br />C Gnrubt Dni to Material (AASHTO No. 57) <br />eyd <br />200 <br />D Gaotmisle PileerlCushion with 2 -as. overlap and sawn at =in <br />sq yd <br />I_w <br />22 <br />tat Cleaning and Video Inspection of LCS and LDS <br />3 <br />1 <br />23 <br />Tranches with h lhhpavd EUMM <br />700 <br />$6.97 <br />$17.03 <br />S7,2 .00 <br />24 <br />E-variun, Gmding, and Compaction for Sump <br />IS <br />1 <br />25 <br />10-io. Dia. Palormd Lachaw nwection Manifeld <br />soh <br />1 <br />$22 34980 <br />$23 15 a2C <br />S 45.512 3.00 <br />26 <br />LCS & LDS Cleanout <br />10 -in Dia Solid SDR -17 LCS Clean" ancta <br />n" Pipe with Onslost, SBoo <br />A eidallodwFtRings <br />20 <br />$40.66 <br />$53.39 <br />$1.88D.001 <br />B 4'X57(5• Fiber Reinforced Corinda Collar <br />each <br />3 <br />IG-im Dia Solid SDR -17 LDS Cianoat Pipe with Gasket, Secure Boot <br />C. <br />and all cd-Fittires <br />LF <br />130 <br />D LCS & LDS Clarioix Cap tied fittings <br />each <br />] <br />$1,629.3 <br />$1,320.65 <br />E I WYE Fittings for LCS Cleanout <br />each <br />1 1 <br />$4,644.0 <br />$2,756.00 <br />$7.40 .00 <br />27 <br />Wall Slavawithiik-haiialSeel <br />each <br />1 12 <br />C316 nol <br />$234.00 <br />16.& LM <br />28 <br />ILinerPerietoiluinBox <br />I each <br />1 ] <br />$12,280.001 <br />6220.0 <br />$55,501).001 <br />FI9363A\Bid Form, Rev. 2 Page 1 I December 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.