My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M, ~ CIVIL ENGINEERS <br />EXHIBIT A <br />1655 2711 Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />Masteller & Moler, Inc. is pleased to present the Indian River County Department of Utilities Services <br />(IRCDUS) with this Work Order which provides for performance of civil engineering and related <br />subconsultant services associated with the design and permitting for the following proposed work: <br />Phase 1: Installation of a replacement Electric Services for the Spoonbill Marsh <br />Demineralized Concentrate Treatment Facility Raw Water Pumping Station; and <br />Phase 2: Upgrade the existing unpaved access maintenance roadway leading to the Raw <br />Water Pumping Station. <br />Project Description: <br />The Project will involve two (2) phases of Design, Permitting & Construction. Phase 1 will include <br />the construction of a new electrical power system to the existing Spoonbill Marsh Intake Pumping <br />Facility to replace the wiring, which has been determined to be in failure mode. Phase 2 will involve <br />upgrading the existing maintenance roadway leading to the intake pumping facility to a higher <br />elevation. <br />The work is proposed to be completed on lands owned by Grand Harbor North Lands LLC (GHNL). It <br />shall be the County's responsibility to obtain, if required, authorization from GHNL for performance <br />of the work. It is acknowledged the Consultant has a contractual relationship with GHNL as related <br />to the ongoing Spoonbill Preserve residential development project. Consultant's services do not <br />include any negotiations with GHNL on behalf of the County as related to this work authorization. <br />Specifically, Masteller & Moler, Inc. and its subconsultants propose to perform the following scope <br />of services: <br />Scope of Work: <br />Phase 1: New Electric Power Service <br />Task 1A — Civil Engineering Design & Preparation of Construction Plans: <br />Consultant shall design and prepare Civil Construction Plans for the installation of a new electric <br />power system to the Spoonbill Marsh Intake Pumping Facility from the existing transformer to <br />the Intake Pumping Facility's control panel. <br />As a result of previous work completed on this project, it has been determined the route of the <br />new direct buried power system shall generally follow the southern edge of the existing unpaved <br />maintenance road. <br />The Construction Plans will also depict the expected temporary impacts of wetlands that will <br />occur as a result of the proposed new electric power installation. <br />Page 1 of 11 164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.