My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M 1 _ CIVIL ENGINEERS — <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />Engineering Certifications: Upon completion of civil construction work and review of As -Built <br />and Testing results to confirm proper construction, we shall prepare Engineering Certifications <br />to be submitted to the following agencies: <br />1. IRC Department of Utility Services; <br />2. Florida DEP Temporary Wetlands Impact Restoration Certification <br />3. ACOE Temporary Wetlands Impact Restoration Certification <br />Our submittal of certifications assumes that all civil work will be properly constructed and tested <br />prior to submittal of the Engineering Certifications and request to place systems into operation. <br />Phase 2 — Unpaved Maintenance Road Upgrade <br />Task 2A — Civil Engineering Design & Construction Plans <br />Consultant shall design and prepare Construction Plans for the upgrade of the existing unpaved <br />maintenance roadway from the vicinity of the Spoonbill Marsh Florida Power & Light <br />Transformer to the Intake Pumping Facility. It is intended to have roadway remain unpaved, <br />however, be designed to be raised to a minimum elevation of 3.0' NAVD88. <br />The Construction Plans will include the estimated limits of permanent wetlands impacts. Due to <br />the fact the upgraded roadway will remain unpaved with a similar surface, has limited use, and <br />there will be no increase in impervious surfaces, the Construction Plans will not be supported by <br />any stormwater computations. <br />As the scope of the work to upgrade the existing roadway is considered a maintenance upgrade, <br />we have not included any scope of services related to obtaining a permit associated with the <br />treatment and attenuation of the runoff from the roadwav as runoff conditions will not be <br />substantially altered. <br />Task 213 — Environmental Services <br />It is anticipated the Phase 2 construction work will result in "Permanent" wetland impacts for <br />which mitigation will be required. Consultant shall provide for the required Environmental <br />Services to be performed by subconsultant Atlantic Environmental of Florida, LLC to include the <br />following services: <br />• FDEP / SJRWMD Environmental Resource Permitting (by Atlantic Environmental of Florida): <br />A. UMAM Analysis (IF REQUIRED): Based on the site inspections and coordination with the <br />FDEP, Atlantic Environmental will develop a Unified Mitigation Assessment Methodology <br />(UMAM) analysis for any wetland impact allowing the Functional Loss that will occur to <br />the wetlands as a result of the project. In addition, Atlantic Environmental will develop a <br />wetland mitigation strategy that will provide sufficient Relative Functional Gain to offset <br />the calculated Functional Loss. The UMAM analysis will be generated for a mitigation <br />Page 6 of 11 169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.