My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS — <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772)567-5300 <br />The intent of the FDEP /ACOE certifications will be to confirm the project has been constructed <br />with no more wetland impacts than was permitted. <br />We shall prepare One (1) Engineering Certification for each of the above -listed permits. Our <br />submittal of certifications assumes that all maintenance roadway upgrade work will be properly <br />constructed and tested prior to submittal of the Engineering Certifications. <br />Fee Schedule: <br />Phase 1— New Electric Power Svstem <br />Task 1A — Civil Engineering Design & Preparation of Construction Plans $ 8,000.00 <br />Task 1B — Electrical Engineering Design & Preparation of Construction Plans $ 4,600.00 <br />Task 1C — Environmental Services $ 10,350.00 <br />Task 1D — Soils Investigation $ 4,025.00 <br />Task 1E(1) — Construction Procurement Services (Civil) $ 3,000.00 <br />Task 1E(2) — Construction Procurement Services (Electric) $ 1,150.00 <br />Task 1F — Construction Services (Electrical) $ 6,325.00 <br />Task 1G — Construction Services (Civil) $ 5,000.00 <br />Sub -Total $ 42,450.00 <br />Phase 2 — Unsaved Maintenance Roadwav UoRrade <br />Task 2A — Civil Engineering Design & Preparation of Construction Plans $ 16,000.00 <br />Task 2B — Environmental Services $ 14,260.00 <br />Task 2C — Construction Procurement Services $ 3,000.00 <br />Task 2D — Construction Services (Civil) $ 8,000.00 <br />Sub -Total $ 41,260.00 <br />Reimbursable Expenses Phases 1 & 2 (Not To Exceed) $ 4,000.00 <br />Total Fees $ 87,710.00 <br />Permit review fees are not included in the fees above. As the permit review fees are unknown <br />at this time, Consultant shall provide the fees and will invoice for them separately to be <br />reimbursed by the County. <br />Mitigation fees are excluded from this Work Order. <br />[Remainder of this page is intentionally left blank.] <br />Page 10 of 11 173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.