My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />2 February 2024 <br />Page 3 <br />Phase 1: General Consulting/Meeting Support/Project Management <br />Phase 1 consists of three components: general consulting, meeting support, and project <br />management. Geosyntec will provide SWDD with consulting services necessary to initiate the <br />project. Geosyntec will prepare presentation graphics, engineering drawings, and other <br />documents required to support the Project's meetings and coordination activities. <br />A kickoff meeting with SWDD is proposed before the start of project activities so that the <br />specific project requirements can be discussed. If required by SWDD, Geosyntec will prepare <br />for and attend a meeting with the SWDD Board to explain the project scope and budget <br />requirements. In addition, review meetings will be held with SWDD as necessary during the <br />various phases of the project implementation schedule. Following each meeting, Geosyntec will <br />prepare meeting minutes that document decisions reached in the meetings. <br />Project management activities will include: budget and schedule tracking, invoice review, and <br />project communications, including the preparation of a monthly progress report. The project <br />report will include a description of the activities completed during the month and planned <br />activities for the following month. In addition, the progress report will identify any technical or <br />administrative issues that require SWDD's attention and the current status of the budget and <br />schedule. <br />For the purpose of this budget estimate, Geosyntec has included three meetings: (i) one kickoff <br />meeting with SWDD; (ii) one meeting with the SWDD Board, if requested by SWDD;; and (iii) <br />one meeting with SWDD at the completion of Phase 2 of the project. Additional meetings are <br />addressed in the remaining phases of this proposal. <br />Phase 2: Preparation of IFC Documents <br />During the bidding process several addenda were issued in response to bidders' questions. The <br />addenda included revisions to the Issued -for Bid QFB) documents. Geosyntec will update all <br />the construction documents to incorporate the applicable addenda and complete IFC Documents <br />for the selected contractor. The documents affected include Construction Drawings, Technical <br />Specifications, and CQA Plan. A PE sealed and signed copy of the IFC Documents will be <br />submitted to FDEP Tallahassee as part of notification of Cell 3 Phase 2 construction. Copies <br />will also be distributed to the selected contractor, SWDD and Republic. <br />NCP2323543UL23075 Proposal for Engineering and Construction Services kbtreview.doc <br />engineers I scientists I innovators 233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.